Laserfiche WebLink
Affidavit of Availability <br /> Minds Department For the Letting of 6/9/2014 <br /> of Transportafion (Letting date) <br /> Bureau of Construction Instructions: Complete this form by either typing or using black ink. <br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this form are <br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work. <br /> ' Part I. Work Under Contract <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> ' recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> Contract Number 74450 72961 68409 72829 Lake Cty <br /> ' Contract With Howell Mt Carmel Mt Carmel Mt Carmel Peter Baker <br /> Estimated Completion Date 8114 10/14 9/14 8114 9/14 <br /> ' Total Contract Price Accumulated <br /> 183,562.00 177,763.00 258,150.00 281,195.00 416,555.00 Totals <br /> Uncompleted Dollar Value if Firm is the <br /> Prime Contractor 1,036,490.00 <br /> Uncompleted Dollar Value if Firm is the <br /> ' Subcontractor 75,086.001 133,000.001 175,000.00 175,7".001 416,555.00 2,834,526.00 <br /> Total Value of All Work 3,871,016.00 <br /> Part 11. Awards Pending and Uncompleted Work to be done with your own forces. <br /> ' List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own fomes. All work Accumulated <br /> Subcontracted to others will be listed on the reverse of this form. Ina joint venture,list only that portion of the work to be done by your <br /> company. If no work is contracted,show NONE. Totals <br /> ' Earthwork 0.00 <br /> Portland Cement Concrete Paving 0.00 <br /> HMA Plant Mix 255,123.00 <br /> ' HMA Paving 591,708.00 <br /> Clean&Seal Cracks/Joints 7,000.00 <br /> Aggregate Bases&Surfaces 66,457.00 <br /> ' Highway,R.R.and Waterway Structures 0.00 <br /> Drainage 0.00 <br /> Electrical 0.00 <br /> Cover and Seal Coats 21,170.00 <br /> Concrete Construction 0.00 <br /> ' Landscaping 0.00 <br /> Fencing 0.00 <br /> ' Guardrail 0.00 <br /> Painting 0.00 <br /> Signing 1,050.00 <br /> ' Cold Milling,Planning&Rotomilling 75,086.00 218,122.00 <br /> Demolition 0.00 <br /> Pavement Markings(Paint) 11,180.00 <br /> ' Other Construction(List) 0.00 <br /> Stabilization 133,000.00 175,000.00 175,744.00 623,271.00 <br /> ' CIR 416,555.00 2,066,584.00 <br /> Totals 75,086.00 133,000.00 175,000.00 175,744.00 416,555.00 3,861,665.00 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> ' result in non-issuance of an"Authorization To Bid." This form has been approved by the State Fortes Management Center. <br /> Printed 6/9/2014 Page 3 of 10 BC 57(Rev.08/17/10 <br />