Laserfiche WebLink
CHECK SHEET <br /> FOR <br /> RECURRING SPECIAL PROVISIONS <br /> Adopted January 1,2014 <br /> The following RECURRING SPECIAL PROVISIONS indicated by an "X" are applicable to this contract and are included by <br /> reference: <br /> RECURRING SPECIAL PROVISIONS <br /> ' CHECK SHEET# PAGE NO. <br /> 1 ❑ Additional State Requirements for Federal-Aid Construction Contracts <br /> (Eff.2-1-69)(Rev.1-1-10) 149 <br /> 2 ❑ Subletting of Contracts(Federal-Aid Contracts)(Eff.1-1-88)(Rev.5-1-93) 152 <br /> 3 ❑ EEO(Eff.7-21-78)(Rev. 11-18-80) 153 <br /> 4 ❑ Specific Equal Employment Opportunity Responsibilities Non Federal-Aid Contracts 163 <br /> (Eff.3-20-69)(Rev.1-1-94) <br /> 5 ❑ Required Provisions-State Contracts(Eff.4-1-65)(Rev.1-1-13) 168 <br /> 6 ❑ Asbestos Bearing Pad Removal(Eff.11-1-03) 173 <br /> 7 ❑ Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 174 <br /> ' (Eff.6-1-89)(Rev.1-1-09) <br /> 8 ❑ Haul Road Stream Crossings,Other Temporary Stream Crossings,and In-Stream Work Pads <br /> (Eff. 1-2-92)(Rev.1-1-98) 175 <br /> 9 ❑ Construction Layout Stakes Except for Bridges(Eff.1-1-99)(Rev.1-1-07) 176 <br /> 10 ❑ Construction Layout Stakes(Eff.5-1-93)(Rev.1-1-07) 179 <br /> 11 ❑ Use of Geotextile Fabric for Railroad Crossing(Eff. 1-1-95)(Rev.1-1-07) 182 <br /> 12 ❑ Subsealing of Concrete Pavements(Eff.11-1-84)(Rev.1-1-07) 184 <br /> 13 ❑ Hot-Mix Asphalt Surface Correction(Eff.11-1-87)(Rev.1-1-09) 188 <br /> 14 ❑ Pavement and Shoulder Resurfacing(Eff.2-1-00)(Rev.1-1-09) 190 <br /> 15 ❑ PCC Partial Depth Hot-Mix Asphalt Patching(Eff. 1-1-98)(Rev.1-1-07) 191 <br /> 16 ❑ Patching with Hot-Mix Asphalt Overlay Removal(Eff.10-1-95)(Rev.1-1-07) 193 <br /> 17 ❑ Polymer Concrete(Eff.8-1-95)(Rev.1-1-08) 194 <br /> 18 ❑ PVC Pipeliner(Eff.4-1-04)(Rev. 1-1-07) 196 <br /> 19 ❑ Pipe Underdrains(Eff.9-9-87)(Rev. 1-1-07) 197 <br /> 20 ❑ Guardrail and Barrier Wall Delineation(Eff.12-15-93)(Rev.1-1-12) 198 <br /> 21 ❑ Bicycle Racks(Eff.4-1-94)(Rev.1-1-12) 202 <br /> 22 ❑ Temporary Modular Glare Screen System(Eff.1-1-00)(Rev. 1-1-07) 204 <br /> 23 ❑ Temporary Portable Bridge Traffic Signals(Eff.8-1-03)(Rev.1-1-07) 206 <br /> 24 ❑ Work Zone Public Information Signs(Eff.9-1-02)(Rev.1-1-07) 208 <br /> 25 ❑ Night Time Inspection of Roadway Lighting(Eff.5-1-96) 209 <br /> 26 ❑ English Substitution of Metric Bolts(Eff.7-1-96) 210 <br /> 27 ❑ English Substitution of Metric Reinforcement Bars(Eff.4-1-96)(Rev.1-1-03) 211 <br /> 28 ❑ Calcium Chloride Accelerator for Portland Cement Concrete(Eff.1-1-01)(Rev.1-1-13) 212 <br /> 29 ❑ Portland Cement Concrete Inlay or Overlay for Pavements(Eff.11-1-08)(Rev.1-1-13) 213 <br /> 30 ❑ Quality Control of Concrete Mixtures at the Plant(Eff.8-1-00)(Rev. 1-1-14) 216 <br /> 31 ❑ Quality Control/Quality Assurance of Concrete Mixtures(Eff.4-1-92)(Rev.1-1-14) 224 <br /> 32 ❑ Digital Terrain Modeling for Earthwork Calculations(Eff.4-1-07) 240 <br /> 33 ❑ Pavement Marking Removal(Eff.4-1-09) 242 <br /> 34 ❑ Preventive Maintenance—Bituminous Surface Treatment(Eff. 1-1-09)(Rev.1-1-12) 243 <br /> 35 ❑ Preventive Maintenance—Cape Seal(Eff.1-1-09)(Rev.1-1-12) 249 <br /> ' 36 ❑ Preventive Maintenance—Micro-Surfacing(Eff.1-1-09)(Rev.1-1-12) 264 <br /> 37 ❑ Preventive Maintenance—Slurry Seal(Eff.1-1-09)(Rev.1-1-12) 275 <br /> 38 ❑ Temporary Raised Pavement Markers(Eff.1-1-09)(Rev.1-1-14) 285 <br /> 39 ❑ Restoring Bridge Approach Pavements Using High-Density Foam(Eff.1-1-09)(Rev.1-1-12) 286 <br />