My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-50 AUTHORIZING AGREEMENT WITH STATE FOR IMPROVEMENTS TO LAKE SHORE DRIVE AND 22ND STREET
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-50 AUTHORIZING AGREEMENT WITH STATE FOR IMPROVEMENTS TO LAKE SHORE DRIVE AND 22ND STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:03 AM
Creation date
7/29/2015 2:51:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-50
Res Ord Title
AUTHORIZING AN AGREEMENT WITH THE STATE OF ILLINOIS FOR IMPROVEMENTS TO LAKE SHORE DRIVE AND 22ND STREET FROM OLD RTE. 51 TO U.S. RTE. 36
Approved Date
5/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISBURSEMENT REQUESTS <br /> The following items MUST be checked (X) for compliance. If'not in compliance. explain in the text of <br /> disbursement request letter. <br /> Indicate by checking below that: <br /> a. A current, separate proiect construction account fund exists. <br /> b. All unexpended loan funds are invested in an interest bearing account. <br /> C. Adequate construction engineering is being provided. <br /> d. The engineering charges have been reviewed and the charges are reasonable, supported <br /> by documentation and in accordance with the approved engineering contract. <br /> e. No refunds.rebates or credits have been received by the borrower. <br /> f. Appropriate flood insurance under the national Flood Insurance Act of 1968, as amended, <br /> has been acquired and maintained. At the time of FINAL disbursement, evidence must <br /> be submitted showing required flood insurance has been purchased for all eligible <br /> construction. <br /> g. The sewer/water use ordinance and user rate ordinance incorporating the user charge <br /> system have been enacted and submitted prior to the first loan disbursement. <br /> h. The dedicated source of revenue has been enacted and submitted prior to the first loan <br /> disbursement. <br /> i. Executed construction contract documents have been submitted prior to the first loan <br /> disbursement. <br /> �j. Each prime contractor has current and appropriate insurance coverage including <br /> workman* compensation,public liability and property damage, fire,and extended <br /> coverage including Akll Risk@ype of Builders Risk Insurance. <br /> k. If this is a FINAL disbursement request, a set of plans of record (including revised sheets <br /> to the plans for all change orders which have been issued)must be sent to the appropriate <br /> State Regional Office. Please send a copy of the transmittal letter to the Infrastructure <br /> Financial Assistance Section, Illinois Environmental Protection Agency. <br /> I hereby certif},that this request for disbursement is,to the best of my knowledge and belief,a true and <br /> accurate request for disbursement;that it is made in accordance with the conditions of the loan for the <br /> project; and that I am authorized to request disbursements on behalf of the borrower. <br /> Authorized Representative Title <br /> (Name printed or typed) <br /> KS032002.sed <br />
The URL can be used to link to this page
Your browser does not support the video tag.