Laserfiche WebLink
The annual paving projects generally include a significant amount of patching to repair failed <br /> street sections that are becoming more prevalent throughout the City as capital improvement <br /> funds devoted to pavement maintenance are reduced. A preliminary list of locations to be patched <br /> is included. This year a small amount of crack sealing will also be included to help some of the <br /> newer streets last longer. <br /> The proposed street list is as follows (see attached location maps): <br /> Street Begin End Surface Treatment Length (feet) Length <br /> Lane Miles) <br /> Oakland W.Main Mill and <br /> Avenue Street Eldorado Street Overlay/Reconstruction 1,566 0.59 <br /> Grand Clinton Illinois Street Mill and Overlay 1,282 0.97 <br /> Avenue Street <br /> Mound Road Constant Bridge just east of Mill and Overlay 2,710 2.05 <br /> View Drive Neely Avenue <br /> Total Length 5,558 3.61 <br /> SCHEDULE: <br /> Design work for the 2014 Street Restoration Project is being sent to IDOT for review. The <br /> project should begin in July and be completed by September. <br /> BUDGEUTIME IMPLICATION: <br /> 1. Budget Impact: The proposed resolution appropriates $1,400,000 in Motor Fuel Tax funds <br /> for street work. <br /> 2. Staffing Impact: Staff time has been allocated for managing these projects. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation <br /> STAFF REFERENCE: Richard Marley, Public Works Director, Matt Newell, City Engineer <br /> and Griffin Enyart, Civil Engineer I. Richard Marley, will be in attendance at the City Council <br /> meeting to answer any questions of the Council on this item. This memorandum was prepared by <br /> Griffin Enyart, Civil Engineer I and reviewed by Matt Newell, P.E., City Engineer. <br /> Attach: 6 <br /> Page 12 <br />