Laserfiche WebLink
GENERAL CONDITIONS <br /> GC-1 CERTIFICATE OF INSURANCE (Continued) , <br /> Notice: <br /> It shall be an affirmative obligation upon the contractor to advise the City's <br /> Representative at Fax No. (217) 424-2799 or mail to CITY ENGINEER, 1 GARY K. <br /> ANDERSON PLAZA, DECATUR, IL 62523, within two days of the cancellation or <br /> substantive change of any insurance policy set out above, and failure to do so shall be <br /> construed to be a breach of the contract. <br /> NOTICE: THIS CONTRACT WILL NOT BE AWARDED UNTIL THE CONTRACTOR S <br /> HAS PROVIDED THE CITY WITH A CONTRACT PERFORMANCE BOND AND <br /> PROOF OF INSURANCE. <br /> GC-2 CLEANUP , <br /> The Contractor shall at all times keep the premises free from accumulations of surplus , <br /> excavated material, waste material or rubbish caused by their employees or work. <br /> Upon completion of the work, the Contractor shall remove all their rubbish from and ' <br /> about the structures, buildings, and premises, also all their tools, equipment, scaffolding and <br /> surplus materials, and shall leave their work clean, ready for use. In case of dispute, the Owner <br /> may remove the rubbish and surplus materials and charge cost of removals to the Contractor or <br /> separate contractors, if any, in proportion to amounts determined by the Engineer to be just. <br /> GC-3 CONSTRUCTION STAKING ' <br /> The Engineer shall provide basic line and grade staking for construction. Such basic line <br /> and grade shall be limited in general to: <br /> (1) not more than two base lines (generally perpendicular to each other) and one bench <br /> mark for a building, a plant site or a major structure; and <br /> (2) centerline stakes and offset grade stakes, where applicable, at all changes in <br /> direction, manhole location, special structure, or similar critical location, together <br /> with bench marks, as may be necessary, along the line of work for utility <br /> distribution and transmission lines. <br /> Any additional (detailed) construction staking shall be provided by the Contractor, who <br /> shall be fully responsible for transfer of data from the basic lines and grades provided by the <br /> Engineer. Detailed construction staking shall generally include such items as slope stakes, , <br /> intermediate centerline stakes, additional offset grade stakes and similar work. The Contractor <br /> shall also be responsible for setting of all offsets, lines, string lines, reference points, reference <br /> grades, and similar control data required to execute the work under this contract. , <br /> 24 <br />