My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 3:51:53 PM
Creation date
7/30/2015 3:51:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-26
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. FOR CONSTRUCTION ENGINEERING AND RESIDENT INSPECTION SERVICES FOR THE UNION STREET SEWER REHABILITATION
Department
Public Works
Approved Date
4/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> SCOPE OF WORK <br /> UNION STREET SEWER REHABILITATION L17-5280 <br /> CONSTRUCTION ENGINEERING SERVICES <br /> The project is known as UNION STREET SEWER REHABILITATION. The PROJECT shall <br /> consist of the rehabilitation improvements to the City owned Union Street Sewer, Union Street <br /> Relief Sewer, and Old 24" Union Street Sewer as detailed in the construction plans and <br /> specifications entitled Union Street Sewer Rehabilitation L17-5280 March 2014 by <br /> Bainbridge, Gee, Milanski & Associates. This project will be funded with an Illinois EPA SRF <br /> loan. <br /> THEREFORE, In Consideration of these premises and the mutual covenants of the above <br /> described PROJECT: <br /> THE ENGINEER AGREES, <br /> 1. Construction Engineering - Furnish services during the construction period generally <br /> comprised of the following: <br /> A. Print plans and specifications for the PROJECT required for bidding and <br /> construction purposes. <br /> B. Answer design related questions during the bidding and construction period, and <br /> provide assistance to the OWNER in receiving construction bids, analyze bids <br /> received and make recommendations of contract award. <br /> C. Consult with the OWNER and with the Contractor on interpretation of plans and <br /> specifications regarding any changes under consideration as construction <br /> proceeds. <br /> D. Provide periodic job-site observation by the Project Engineer or his <br /> representatives during the construction period. <br /> E. Prepare and submit all payment estimates, change orders, records and reports <br /> required by the OWNER. <br /> F. Attempt to safeguard the OWNER against defects and deficiencies on the part of <br /> the contractor, but the ENGINEER does not guarantee the performance of the <br /> contract by the contractor or subcontractors. <br /> G. Conduct final review of construction and prepare final papers and reports. <br /> H. Revise contract drawings to show location and nature of improvement as <br /> constructed and supply "record drawings" consisting of an electronic file set and <br /> one set of paper prints to the OWNER. <br /> I. Check all shop and working drawings. <br /> J. Review and check all reports by testing laboratories on equipment and material <br /> Last Revised:09-12-2012 A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.