My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 3:51:53 PM
Creation date
7/30/2015 3:51:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-26
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. FOR CONSTRUCTION ENGINEERING AND RESIDENT INSPECTION SERVICES FOR THE UNION STREET SEWER REHABILITATION
Department
Public Works
Approved Date
4/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID PROPOSAL <br /> For Construction of: 2014 Miscellaneous Sanitary Sewer Improvement Project <br /> City Project No.: 2014-09 <br /> Owner: City of Decatur, Illinois <br /> Prospective Bidder: <br /> The undersigned Bidder, having examined the specifications, drawings and all other <br /> documents contained in the Contract Documents, and having examined the site where the work <br /> is being performed, and having familiarized themselves with any local conditions effecting the <br /> work and having knowledge of the cost of work at the place where the work is to be done, hereby <br /> proposes to execute and perform the formal Contract set forth in these Contract Documents, of <br /> which this Proposal forms a part, and will do the work therein described on the terms and <br /> conditions therein set forth; and furnish all required labor, materials, tools, equipment, <br /> transportation and services for said work, and pay all applicable taxes and other incidental costs, <br /> all in strict conformity with the drawings and specifications forming a part of the Contract <br /> Documents, for an amount computed upon the basis of the quantity of work actually performed <br /> at the bid prices noted below. <br /> It is understood that any listed quantities of work to be performed at unit prices are <br /> approximate only, and are intended principally to serve as a guide in evaluating bids. For this <br /> project, quantities have been estimated to cover potential rapid response work and <br /> additional work that may be necessary through May of 2015. The listed quantities are <br /> estimates of needed work over that time period and will not be exact. <br /> It is further agreed that any quantities of work to be performed at unit prices and material <br /> to be furnished may be increased or decreased as may be considered necessary, in the opinion of <br /> the Owner, to complete the work fully as planned and contemplated and that all quantities of <br /> work, whether increased or decreased, are to be performed at the unit prices set forth in the Bid <br /> Proposal, except as provided for in the General Conditions. <br /> It is further agreed that any lump sum prices may be increased to cover additional work <br /> ordered by the Owner, but not shown on the plans or required by the specifications, in <br /> accordance with the provisions of the General Conditions. Similarly, they may be decreased to <br /> cover deletion of work so ordered. Where supplemental unit prices are available, they shall be <br /> used to adjust lump sum prices. <br /> By submitting a bid, the Bidder acknowledges the understanding that the bid process is <br /> solely intended to serve the public interest in achieving the highest quality of services and goods <br /> at the lowest price, and that no right, interest, or expectation shall vest or inure to the benefit of <br /> Bidders as a result of any reliance or participation in the process. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.