My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-19 AUTHORIZING AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-19 AUTHORIZING AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:02 AM
Creation date
7/30/2015 4:35:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-19
Res Ord Title
AUTHORIZING AN AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC FOR CONSTRUCTION ENGINEERING SERVICES FOR THE FRANKLIN STREET STREETSCAPE PROJECT
Approved Date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ e. Inspection of all materials when inspection is not provided at the sources by the STATE BMPR, and submit <br /> inspection reports to the LA and the STATE in accordance with the STATE BMPR "Project Procedures Guide"and <br /> the policies of the STATE. <br /> ❑ f. For Quality Assurance services, provide personnel who have completed the appropriate STATE BMPR QC/QA <br /> trained technician classes. <br /> ❑ g. Inspect, document and inform the LA employee In Responsible Charge of the adequacy of the establishment and <br /> maintenance of the traffic control. <br /> ❑ h. Geometric control including all construction staking and construction layouts. <br /> ® i. Quality control of the construction work in progress and the enforcement of the contract provisions in accordance with <br /> the STATE Construction Manual. <br /> ® j. Measurement and computation of pay items. <br /> ❑ k. Maintain a daily record of the contractor's activities throughout construction including sufficient information to permit <br /> verification of the nature and cost of changes in plans and authorized extra work. <br /> ❑ I. Preparation and submission to the LA by the required form and number of copies, all partial and final payment <br /> estimates,change orders, records,documentation and reports required by the LA and the STATE. <br /> ® m. Revision of contract drawings to reflect as built conditions. <br /> ® n. Act as resident construction supervisor and coordinate with the LA employee In Responsible Charge. <br /> 2. Engineering services shall include all equipment, instruments, supplies,transportation and personnel required to perform the duties <br /> of the ENGINEER in connection with the AGREEMENT. <br /> 3. To furnish the services as required herein within twenty-four hours of notification by the LA employee In Responsible Charge. <br /> 4. To attend meetings and visit the site of the work at any reasonable time when requested to do so by representatives of the LA or <br /> STATE. <br /> 5. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties <br /> without the written consent of the LA. The consent to sublet,assign or otherwise transfer any portion of the services to be furnished <br /> by the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT. <br /> 6. The ENGINEER shall submit invoices, based on the ENGINEER's progress reports, to the LA employee In Responsible Charge,no <br /> more than once a month for partial payment on account for the ENGINEER's work completed to date. Such invoices shall <br /> represent the value, to the LA of the partially completed work, based on the sum of the actual costs incurred, plus a percentage <br /> (equal to the percentage of the construction engineering completed)of the fixed fee for the fully completed work. <br /> 7. That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable to <br /> improvement of the SECTION; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to <br /> perform the services enumerated herein. <br /> 8• That the ENGINEER shall be responsible for the accuracy of the ENGINEER's work and correction of any errors,omissions or <br /> ambiguities due to the ENGINEER'S negligence which may occur either during prosecution or after acceptance by the LA. Should <br /> any damage to persons or property result from the ENGINEER's error, omission or negligent act, the ENGINEER shall indemnify <br /> the LA,the STATE and their employees from all accrued claims or liability and assume all restitution and repair costs arising from <br /> such negligence. The ENGINEER shall give immediate attention to any remedial changes so there will be minimal delay to the <br /> contractor and prepare such data as necessary to effectuate corrections,in consultation with and without further compensation from <br /> the LA. <br /> 9. That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes,and local laws or ordinances of the LA. <br /> 10. The undersigned certifies neither the ENGINEER nor I have: <br /> a) employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person(other <br /> than a bona fide employee working solely for me or the above ENGINEER)to solicit or secure this AGREEMENT; <br /> Page 2 of 8 BLR 05611 (Rev. 01/10/12) <br /> Printori nn 911R/,)n1d 7-.r,�•nn PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.