My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-19 AUTHORIZING AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-19 AUTHORIZING AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:02 AM
Creation date
7/30/2015 4:35:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-19
Res Ord Title
AUTHORIZING AN AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC FOR CONSTRUCTION ENGINEERING SERVICES FOR THE FRANKLIN STREET STREETSCAPE PROJECT
Approved Date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMA may use the information in plans. resulting there from. This indemnification shall <br /> survive the ternination of this Agreement. <br /> 16 HAZARDOUS OR TOXIC <br /> MATERIALS 19 CONSTRUCTION OBSERVATION <br /> This Agreement does not include MMA shall visit the site at intervals <br /> services related to the presence of hazardous or appropriate to the stage of construction, or as <br /> toxic materials. Should the presence of outlined in the Scope of Services to observe the <br /> hazardous or toxic material be found or progress and quality of Contractor's work. <br /> suspected, MNIA may without liability for Such visits and observation are not intended to be <br /> consequential or other damages, suspend exhaustive checks or a detailed inspections of the <br /> performance of its services until qualified work, rather to allow MMA to become generally <br /> persons are retained to identify and abate or familiar with the Work in progress and to <br /> remove the materials and warrant that the site is determine,in general,if the work is proceeding in <br /> in compliance with applicable laws and accordance with the Contract Documents. <br /> regulations. CONSULTANT agrees to MMA shall keep the CLIENT inforned about the <br /> indemnify MMA, its officers, partners, progress of the Work and shall advise the <br /> employees and subconsultants from all claims, CLIENT about observed deficiencies in the <br /> suits, demands, liabilities, and costs including Work. If CLIENT desires more extensive <br /> attorney's fees related to hazardous or toxic project observation or full-time project <br /> materials. representation, the Client shall request such <br /> additional services by MMA as a Modification to <br /> 17 DELIVERY OF ELECTRONIC Agreement. <br /> FILES MMA shall not supervise, direct or have <br /> control over the Contractor's work nor have any <br /> Electronic files furnished by either party responsibility for the means, methods, <br /> shall be subject to an acceptance period of thirty techniques, sequences or procedures selected or <br /> (30) days during which any apparent for safety precautions or programs implemented <br /> discrepancies will be identified and corrected. by the Contractor. These are the Contractor's <br /> In the event of conflict between the signed sole responsibility. <br /> construction documents prepared by MMA and MMA shall not be responsible for any <br /> electronic files, the signed or sealed hard-copy acts or omissions of the Contractor, any <br /> construction documents shall govern. subcontractor,any entity performing any portions <br /> of the Work, or their agents or employees. <br /> 18 OWNERSHIP OF INSTRUMENTS MMA does not guarantee the performance of the <br /> OF SERVICE Contractor and shall not be responsible for the <br /> Contractor's failure to perform its Work in <br /> All documents including drawings, accordance with the Contract Documents or any <br /> reports, and specifications including documents applicable laws, codes, rules or regulations. <br /> provided by electronic media furnished by MMA <br /> pursuant to this agreement are instruments of its 20 JOBSITE SAFETY <br /> services. MMA shall retain all common law, <br /> statutory and other reserved rights including the The General Contractor is solely <br /> copyright thereto. Instruments of service are not responsibility for Jobsite and Worker Safety <br /> intended for reuse by CONSULTANT or others including safety related to construction means, <br /> on extensions of this project or any other project. methods, sequence, techniques and health and <br /> Any reuse without specific written safety,and for precautions required by regulatory <br /> CONSULTANT verification or adaption by agencies, all in accordance with the Contract <br /> MMA will be at the CONSULTANT's sole risk, Documents. Professional services and activities <br /> and without liability to MMA. CONSULTANT impose no duty on MMA for Jobsite Safety. <br /> shall indemnify and hold harinless MMA from all CONSULTANT agrees that the MMA <br /> claims, damages, losses and expenses including and ANY MMA subconsultants shall be made <br /> court costs and attorney's fees arising out of or additional insured under the General Contractor's <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.