My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-19 AUTHORIZING AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-19 AUTHORIZING AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:02 AM
Creation date
7/30/2015 4:35:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-19
Res Ord Title
AUTHORIZING AN AGREEMENT WITH CHASTAIN & ASSOCIATES, LLC FOR CONSTRUCTION ENGINEERING SERVICES FOR THE FRANKLIN STREET STREETSCAPE PROJECT
Approved Date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions for Preparation of Form BC 775 <br /> 23 CFR 635.105 requires that the state transportation department(STD) has responsibility for the construction of all Federal- <br /> aid projects, and is not relieved of such responsibility by authorizing performance of the work by a local public agency or other <br /> cederal agency. <br /> When a project is located on a street or highway over which the STD does not have legal jurisdiction, or when special <br /> conditions warrant, the STD, while not relieved of overall project responsibility, may arrange for the local public agency having <br /> jurisdiction over such street or highway to perform the work with its own forces or by contract. In those instances where a local <br /> public agency elects to use consultants for construction engineering services, the local public agency shall provide a full-time <br /> employee of the agency to be in responsible charge of the project. <br /> The full-time local public agency employee in responsible charge of the project shall perform the following duties and <br /> functions: <br /> • Administer inherently governmental project activities, including those dealing with cost, time, adherence to contract <br /> requirements, construction quality and scope of projects; <br /> • Maintain familiarity of day to day project operations, including project safety issues; <br /> • Make or participate in decisions about changed conditions or scope changes that require change orders or <br /> supplemental agreements; <br /> • Visit and review the project on a frequency that is commensurate with the magnitude and complexity of the project; <br /> • Review financial processes, transactions and documentation to ensure that safeguards are in place to minimize fraud, <br /> waste, and abuse; <br /> • Direct project staff, agency or consultant, to carry out project administration and contract oversight, including proper <br /> documentation; and <br /> • Aware of the qualifications, assignments and on-the-job performance of the agency and consultant staff at all stages <br /> of the project. <br /> The Department of Transportation, in accordance with the requirements, requires s the local public agency to identify the local <br /> public agency employee who will be in responsible charge of each Federal-Aid project which will be constructed under the <br /> supervision of the county, municipality or other public agency. County Engineers, Municipal Engineers, and full-time local <br /> public agency employees registered as a professional engineer should be identified in the pre-construction meeting minutes. <br /> All other resident construction supervisors must submit their qualifications on this form for approval by the department. <br /> Resident construction supervisors who are consultants shall be certified in Documentation of Contract Quantities and their <br /> firm shall be prequalified in Construction Inspection. <br /> This form will be completed by the applicant, endorsed by a representative of the local public agency, and submitted to the <br /> Deputy Director Division of Highways, Regional Engineer prior to the start of construction. This signatory for the local public <br /> agency should be the County Engineer or Municipal Engineer, as applicable. In the event a municipality does not have a <br /> Municipal Engineer, the applicant will be recommended by the appropriate municipal authority. <br /> If a consultant is named on this form, the approved form will be included as an attachment to the appropriate construction <br /> engineering consultant agreement. <br /> This document should be discussed as part of the preconstruction conference and a copy of the approved form retained with <br /> the preconstruction meeting minutes. <br /> Printed 3/28/2014 Page 2 of 2 BC 775(Rev.01/10/12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.