Laserfiche WebLink
Project Name: 2014 Trenchless Long Lining Repairs <br /> LLC Heitkamp, Inc. Visu-Sewer <br /> Project Number: 2014-28 99 Callender Road of Missouri,LLC <br /> 66 PO Box 730 PO Box 845 <br /> Watertown,CT 06795 Glen Carbon,IL 62034 <br /> Bid Date: Wednesday,March 5,2014 <br /> David P Ebner Keith Alexander <br /> Time: 10:00 A.M. Vice President President <br /> 4 Ph: 678-510-1820 x 216 Ph: 262-695-2340 <br /> Fund: Sewer Fund 10 Fax: 678-510-1826 Fax: 262-695-2359 <br /> Ashley Frew James Bohn,Vice Pres. <br /> Organization Code: 79487906 m a.frew(a)eheitkamp.com jamesb(aD.visu-sewer.com <br /> Object Code: 489030 <br /> Item Pay Item tal Unit Price Total Unit Price Total <br /> No. <br /> 1 SANITARY SEWER LINER,8 INCH 650.00 $25.20 $297,360 00 $27.95 $329,810.00 <br /> 2 SANITARY SEWER LINER, 10 INCH 423.80 $31.00 $45,78700 $35.00 $51,695.00 <br /> 3 SANITARY SEWER LINER, 12 INCH 904.00 $37.00 $58,904100 $42.65 $67,898.80 <br /> 4 SANITARY SEWER LINER, 15 INCH 993.25 $50.00 $12,350100 $102.601 $25,342.20 <br /> 5 SANITARY SEWER LINER,27 INCH 320.00 $72.00 $10,08000 $220.00 $30,800.00 <br /> 6 PROTRUDING LATERAL CUT-OUT 000.00 $175.00 $1,40000 $250.00 $2,000.00 <br /> 7 SANITARY SEWER LATERAL REINSTATEMENT 150.00 $125.00 $40,75000 $100.00 $32,600.00 <br /> 8 FINAL PROJECT REPORT 500.00 $2,000.00 $2,00000 $250.00 $250.00 <br /> A119 CURED-IN-PLACE LINER TESTING 000.00 $350.00 $10,50000 $350.00 $10,500.00 <br /> 10 ALTERATIONS,CANCELLATIONS, EXTENTIONS, DEDUCTIONS AN[000.00 $15,000.00 $15,00000 $15,000.00 $15,000.00 <br /> EXTRA WORK <br /> INITIAL VIDEO INSPECTION 500.00 $1.50 $7,500:00 $2.75 $13,750.00 <br /> TOTAL BASE BIDS(AS CORRECTED) 441.051 $501,631.00 $579,646.00 <br /> Percent Over Under ENGINEER'S ESTIMATE B% � 3.70% IE==E 19.82% <br /> A-1 SANITARY SEWER LINER,6 INCH 525.00 $25.00 $3,750.00 $102.60 $15,390.00 <br /> A-2 SANITARY SEWER LINER, 15 INCH 180.00 $50.00 $30,200.00 $102.60 $61,970.40 <br /> A-3 PROTRUDING LATERAL CUT-OUT 250.00 $175.00 $175.00 $250.00 $250.00 <br /> A-4 SANITARY SEWER LATERAL REINSTATEMENT 350.00 $125.00 $1,750.00 $100.00 $1,400.00 <br /> TOTAL ALTERNATE 1 BID (AS CORRECTED) =41 1 $35,878.00 1 1 $79,010.40 <br /> Percent Over Under ENGINEER'S ESTIMATE 3% 7.64% ==E137.051/6 <br /> HTOTAL BASE BIDS+ BID ALTERNATE 1 (AS CORRECTED) 746.05 $537,50 .00 $658,656.40 <br /> IPercent Over Under ENGINEER'S ESTIMATE9% 3.95% 27.38% <br /> Matthew C. Newell, P.E., City Engineer <br />