My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:19 AM
Creation date
7/31/2015 9:09:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-08
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING BASINS 1 THROUGH 4
Department
Water
Approved Date
2/3/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> i. If so what type of material does the dam consist of(i.e. rip rap, clay, sand, <br /> etc)? <br /> ' -N.A. <br /> b. Is it the purposes of this contract to form out of existing materials this dam? <br /> ' - Yes <br /> If so can the contractor dredge floatation deeper than the 610' elevation, <br /> shown at the crest of the dam, into the far Eastern end of Big Creek and <br /> then go back& construct the dam to the elevations indicated in the <br /> ' plans, following that dredging, with excavators? <br /> - The method and means by which the dam is constructed is the <br /> ' decision of the Contractor. The Owner is interested in construction <br /> which will result in a long term use of the silt trap. <br /> ' s. Plan Sheet No. 24 details Basin 6 Sediment Trap Dredging Limit. <br /> a. Can the owner please provide additional details regarding the dredging template <br /> in Basin 6? <br /> ' - Yes, the Owner will supply additional information regarding the shape of this <br /> trap at the conclusion of construction in 2011 as a part ofAddendum No. 1. <br /> ' b. What are the dredge depth elevations? <br /> - These elevations will be included in Addendum No. 1. <br /> ' 6. Bid Item 201001110 Tree Removal 6 to 15 Units Diameter Unit indicates a quantity of <br /> 250. <br /> ( ) 9 Y <br /> ' a. Does this bid item handle the removal of all of the trees within the Oakley <br /> Sediment Basin as indicated on plan sheet no. 27 in the notes? <br /> ' - Yes. Trees are defined in the SSRBC as equal to or greater than 6 inches <br /> in diameter. Remaining growth is handled within the verbiage for <br /> Clearing and Grubbing. <br /> b. Is the "6 to 15 Units Diameter" description above read incorrectly? Should <br /> it state, "6 to 12 Inches Diameter"? <br /> ' -A unit represents one inch diameter, so a 6 unit tree is 6 inches in <br /> diameter. <br /> t <br /> ' Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.