Project Name: Lake Decatur Dredging of Basins 14 and Manson Construction Co. Orion Marine Construction,Inc.
<br /> Rehabilitation of Oakley Sediment Basin Enginesfs Estimate Great Lakes Dredge 6 5209 E Marginal Way S. 5440 W.Tyson Ave.
<br /> Dock Company,LLC PO Bax 24067 Tampa,FL 33611
<br /> Project Number: W1314 Chastain&Associates,LLC 2041 Trade Center Ort"East Seattle,WA 99124
<br /> N5 N.Country Club Rd St.Peters,MO 63376 Curtis K Huggins
<br /> Bid Date: Fridaty,December 13,2013 1 Decatur,It.62521 Jessica(Gibson)Grey
<br /> Theresa Messer Proposal Manager Ct uaoins aeorionmartneorouo com
<br /> Time., 2:00 P.M. Executive Assistant 206.764.8563 Dir.
<br /> 314.696.0082 206.762.0850 Office
<br /> Fund:
<br /> tgrev4 mansonconstrumon
<br /> Organization Code:
<br /> Object Code:
<br /> Item Pay#am - QTY Unit- Unit Priv Todd unit Price Total Unit Price Total Unit Price Total
<br /> Number
<br /> XXXXXXX3 WATER CONTROL STRUCTURE 2 1 EACH $126,000.00 $126,000. $269,400.00
<br /> $269,400. 5415,000.00 $475,000. $415,000.00 $415,000.00
<br /> XXXXXXX4 DREDGE MATERIAL 10,736,73 CU YD $6.75 $72,472,947.7 $5.83 $62,595.153. $4.90 $52,609,991.7 $15.18 $162,983,606.9
<br /> XXXXXXX5 BASIN 2-16'DUCTILE IRON WATER MAIN 1 EACH $2,500,000.00 $2,500,000. $1,518,000.00 $1,518,000. $2,415,000.00 $2,415,000. $3,005,588.00 $3,005,588.
<br /> X)OIX)IXX6 BASIN 3-16'DUCTILE IRON WATER MAIN 1 EACH $1,900,000,00 $1,900,000. $1,485,000.00 $1,485,000. $2,090,000.00 $2,090,000. $2,369,354.00 $2,369,354,0
<br /> XX 0000(7 STEEL CASING REMOVAL NO. FOOT $25.00 $750. $59.00 $1,770. $46.00 $1,380. $0.00 $0.
<br /> 001
<br /> X)000=8 TEEL CASING REMOVVAL NO.2 2 FOOT $15.00 $390. $59.00 $1,534. $58.00
<br /> $1.508.0 $0.00 so-04
<br /> Z0068200 STEEL CASINGS 30' FOOT $75.00 $4,200. $178.00 $9,968. $235.00 $13,160.0 $0.00 so-001
<br /> OTALBABE BIDS S CORRECTED $88,387,977, ';
<br /> srcerd Over Under ENGINEERS ESTIMATE ones 31 T4% 151.19%
<br /> ALTER14ATEI
<br /> No.i REDGE BASIN 1-3 ONLY -$2,529,400.0 -$4,616,000. -$12,757,648.261
<br /> EDUCT BASIN 4 DREDGE MATERIAL 748,587) ffli
<br /> ILIZATION
<br /> OJUST FOR REMAINING DREDGING AMOUNT $0. $2,497,036.
<br /> OTAL ALT 1 BIDS AS CORRECTED .52,$55,925.7 -$2,$29-000. -54,616,000. -$12,757,648.2
<br /> OTAL BASE BID♦TOTAL ALT 1 B� S CORRECTED $85,832,051
<br /> accent Over Under ENGINEERS ESTIMATE 29.77% 143.80%
<br /> ALTERNATE
<br /> N0.2 JOREDGE BASIN 1-2 ONLY -$15,328,558.04 -$14,780,000. -$49,288,493.0
<br /> HEDUCT
<br /> T BASIN 3 8 4 DREDGE MATERIAL -3,494,48 CU YD 6.7 -$23,587,740.
<br /> FOR BASIN 3 WATER MAIN -1 EACH -$1,900.000. 41,900,000.
<br /> FOR REMAINING DREDGING AMOUNT 7,242,25 CU YD 0. $3,621,126.
<br /> ALT 2 BIDS AS CORRECTED 421,680,613 415,328,558. $14,760,000. -$49,2118,483-0
<br /> BASE BID r TOTAL ALT 2 BID AS CORRECTED 588 421 383 7 Over Under ENGINEERS ESTIMATE 8.05% 47.93% 152.45%
<br /> ALTERNATE
<br /> No.3 CORLEY LANDFILL-TRUCK PLACE AND SPREAD 13,31 CU YD 118.5M246,235. $28.00 5372,880. $24.00 $319,440. $33.83 $450,277.
<br /> OTAL ALT 3 BIDS AS CORRECTED $372,680. $319,440. $450,277-
<br /> OTAL BASE BID a TOTAL ALT 3 BID S CORRECTED
<br /> errant Over Under ENGINEERS ESTIMATE 1.12% 31.23% 151.00%
<br /> ALTERNATE4
<br /> No.4 MODIFICATION TO BASE BID LABOR FORCE BASE BID $88,387,977,2 $0. 5534.600. 50. $636,713
<br /> .591
<br /> ALL BAST
<br /> OTAL ALT 4 BIDS AS CORRECTED 50. $534,600.0011 11to 511
<br /> Pnnc 2 of 3
<br />
|