My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-91 APPROPRIATE ADDITIONAL MOTOR FUEL TAX FUNDS FOR RESTORATION OF STREETS AND HIGHWAYS
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-91 APPROPRIATE ADDITIONAL MOTOR FUEL TAX FUNDS FOR RESTORATION OF STREETS AND HIGHWAYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
8/7/2015 1:57:39 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-91
Res Ord Title
TO APPROPRIATE ADDITIONAL MOTOR FUEL TAX FUNDS FOR RESTORATION OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
Department
Public Works
Approved Date
8/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RETURN WITH BID <br /> County Macon <br /> PROPOSAL Local Public Agency Dec tur <br /> Section Number 15-0)508-00-FP <br /> Route Various <br /> 1. Proposal of Illinois Valley Paving,a Division of United Contractors Midwest,Inc. <br /> for the improvement of the above section by the construction of Street Restoration, City Project 2015-08 <br /> Resurface/Reconstruct various City streets with hot-mix asphalt surafce and cement <br /> stabilized base asspecified.Remove,replace,and adjust manholes,and valve boxes. Crack <br /> sealing and patching. <br /> a total distance of 5699.00 feet, of which a distance of 5699.00 feet, ( 1.079miles)are to be improved. <br /> 2. The plans for the proposed work are those prepared by City of Decatur Engin erinDivision <br /> and approved by the Department of Transportation on <br /> 3. The specifications referred to herein are those prepared by the Department of Transportation anc designated as <br /> "Standard Specifications for Road and Bridge Construction"and the"Supplemental Specification and Recurring Special <br /> Provisions"thereto, adopted and in effect on the date of invitation for bids. <br /> 4. The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the'Check <br /> Sheet for Recurring Special Provisions"contained in this proposal. <br /> 5. The undersigned agrees to complete the work within working days or by 10131/2015 <br /> unless additional time is granted in accordance with the specifications. <br /> 6. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and <br /> Conditions for Contract Proposals,will be required. Bid Bonds will be allowed as a proposal gua anty. Accompanying this <br /> proposal is either a bid bond if allowed, on Department form BLR 12230 or a proposal guaranty check, complying with the <br /> specifications, made payable to: <br /> Treasurer of <br /> The amount of the check is 5%BID BOND ( )— <br /> 7. In the event that one proposal guaranty check is intended to cover two or more proposals, the arr ount must be equal to <br /> the sum of the proposal guaranties, which would be required for each individual proposal. If the proposal guaranty check <br /> is placed in another proposal, it will be found in the proposal for. Section Number 15-00508-00-FP <br /> B. The successful bidder at the time of execution of the contract will be required to deposit a contra.,t bond for the full <br /> amount of the award. When a contract bond is not required,the proposal guaranty check will be held in lieu thereof. If this <br /> proposal is accepted and the undersigned fails to execute a contract and contract bond as required, it is hereby agreed <br /> that the Bid Bond or check shall be forfeited to the Awarding Authority. <br /> 9. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the <br /> product of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is orr itted, the total price will <br /> be divided by the quantity in order to establish a unit price. <br /> 10. A bid will be declared unacceptable if neither a unit price nor a total price is shown. <br /> 11. The undersigned submits herewith the schedule of prices on BLR 12200a covering the work to b performed under this <br /> contract. <br /> 12. The undersigned further agrees that if awarded the contract for the sections contained in the corr binations on <br /> BLR 12200a, the work shall be in accordance with the requirements of each individual proposal for the multiple bid <br /> specified in the Schedule for Multiple Bids below. <br /> Printed 7/6/2015 Page 4 of 7 BLR 12200(01/08114) <br />
The URL can be used to link to this page
Your browser does not support the video tag.