My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-58 APPROVING THE SOUTHSIDE TAX INCREMENT REDEVELOPMENT PLAN
COD
>
City Clerk
>
ORDINANCES
>
2013
>
2013-58 APPROVING THE SOUTHSIDE TAX INCREMENT REDEVELOPMENT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 9:07:39 AM
Creation date
8/7/2015 2:49:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2013-58
Res Ord Title
APPROVING THE SOUTHSIDE TAX INCREMENT REDEVELOPMENT PLAN
Department
Development Services
Approved Date
7/1/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illinois Environmental Protection Agency <br /> Notice of Public Comment Period for the <br /> Proposed Issuance of a Construction Permit/PSD Approval <br /> Archer Daniels Midland Company in Decatur <br /> Archer Daniels Midland Company has applied to the Illinois EPA for a construction permit o expand the Lysine <br /> Department at its manufacturing complex at 4666 Faries Parkway in Decatur. Lysine is manufactured as a nutritional <br /> supplement for animal feeds. The project would also entail increased utilization of boilers in the existing cogeneration plant <br /> to supply more steam to the Lysine Department. The Illinois EPA previously accepted conunents on a draft construction <br /> permit/PSD approval for the project. The current draft is a result of further review of the a plication considering the <br /> comments that were received on the draft permit, new guidance being developed by USEPA, and certain additional material <br /> submitted by ADM or prepared by the Illinois EPA. <br /> The project is a major modification under the federal rules for Prevention of Significant Deterioration(PSD), 40 CFR <br /> 52.21 with significant increases in emissions of volatile organic material(VOM), nitrogen oxides (NOx), sulfur dioxide <br /> (SO2) and greenhouse gases (GHG). <br /> Based on its review of the application, the Illinois EPA has made a preliminary determinatio 1 that this project will comply <br /> with the applicable environmental regulations and has prepared a draft permit for public review. <br /> The Illinois EPA is accepting comments prior to making a final decision on the application for this project. Comments <br /> must be postmarked by midnight June 29,2013. If sufficient interest is expressed in this atter, a hearing or other <br /> informational meeting may be held. Comments, questions and requests for information, shou d be directed to Brad Frost, <br /> Bureau of Air, Illinois EPA, P. O. Box 19506, Springfield, IL 62794-9506,phone 217/782- 113, TDD 217/782-9143. <br /> Persons wanting more information may view the draft permit and project summary at <br /> http:/hs�z,�.A,.gpa. ov/re,�45oair/permits/ilonline.html These documents and the application ma also be viewed at the Illinois <br /> EPA's offices at 2125 South First Street in Champaign, 217/278-5800 and 1340 N. Ninth St , Springfield, 217/782-7027 <br /> (please call ahead to assure that someone will be available to assist you). Copies of the docu nents will be made available <br /> upon request. <br /> As a major modification, the project is subject to Best Available Control Technology(BACT under PSD for emissions of <br /> VOM. For the new and modified operation in the Lysine Department, BACT would be prow' ed by the low concentration <br /> of VOM naturally present in the exhaust from these operations. The use of add-on control ipment to further reduce <br /> emissions was evaluated and was rejected because it was determined to not be cost-effective. <br /> While the project would be accompanied by increases in emissions of carbon dioxide(CO2), GHG, from the lysine <br /> fermentation operation, this increase is not subject to PSD. This is because this process is a biogenic process and the <br /> applicability of PSD to biogenic CO2 emissions has been deferred by USEPA until July 21, 2 14. <br /> While the project would involve increases in emissions of VOM, NOx, SO2 and GHG from th o existing coal-fired boilers at <br /> the complex's co-generation plant, due to the increase in steam use by the Lysine Department the project does not require a <br /> new determination of BACT for these boilers. This is because these boilers would not undergo physical changes or changes <br /> in the method of operation In this regard, this permit would not provide for increases in emirs ons over permitted levels as <br /> set by the construction permits that were issued for these boilers. <br /> ADM submitted a revised assessment of the impact of the project's emissions on ambient ozo ie air quality. The assessment <br /> continues to indicates that the project would not cause an exceedance of the National Ambient Air Quality Standard for <br /> ozone. ADM's air quality analyses for NO2 and SO2 continue to show maximum impacts for hese pollutants that are below <br /> the significant impact levels under the PSD rules. ADM's new analysis for the impacts of the roject's emissions of NO,, <br /> and SO2 on formation of secondary PM2.5 show that potential contributions that are negligible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.