2013-28 AUTHORIZING THE CITY TO BORROW FUNDS FROM THE WATER POLLUTION CONTROL REVOLVING LOAN FUND
COD
>
City Clerk
>
ORDINANCES
>
2013
>
2013-28 AUTHORIZING THE CITY TO BORROW FUNDS FROM THE WATER POLLUTION CONTROL REVOLVING LOAN FUND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:48:39 PM
Creation date
8/13/2015 3:48:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2013-28
Res Ord Title
AUTHORIZING THE CITY TO BORROW FUNDS FROM THE WATER POLLUTION CONTROL REVOLVING LOAN FUND
Department
Public Works
Approved Date
4/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Noise Ordinance <br /> The Lake Shore Drive Sewer Rehabilitation Project will involve installing acured-in-place liner <br /> in portions of the deteriorated sewers. The lining process involves pulling a felt tube soaked <br /> with resin into the sewer pipe. The felt tube is then inflated using heated wal er or steam until it <br /> is pressed firmly against the wall of the pipe. The water in the tube is kept at a high temperature <br /> until the resin cures and hardens to form a new pipe inside of the deteriorated pipe. <br /> The heating/curing process may take up to 24 hours in each pipe segment due to the size of the <br /> pipe and the volume of water that must be constantly heated and circulated through the lining <br /> tube to cure and harden the resin. This will mean that the contractor will need to run generators, <br /> heaters and pumps, over night in some residential areas. The contract will require noise <br /> reduction measures and work limitations to mitigate the level of noise but it ill not be possible <br /> to abate all noise through the overnight hours when curing of the new sewer lining must <br /> continue. <br /> The attached resolution exempts this project from the construction hours requirements contained <br /> in City Code Chapter 48, titled NUISANCES, in acknowledgment that construction work will be <br /> necessary between the hours of 6 p.m. and 7 a.m. which are outside of the time limits required by <br /> Section 12 "Hours of Construction". <br /> City staff and BGM will work closely with affected residents throughout the uration of the <br /> project to keep disturbances to a minimum. It is anticipated that the project will begin late <br /> summer or early fall and be completed summer of 2014, depending on the c' cumstances of <br /> construction. <br /> PRELIMINARY SCHEDULE: <br /> I-EPA Approves the City's Facilities Plan February 4, 2013 <br /> Plans and Specifications Submitted to the I-EPA March 11, 2013 <br /> City Council Approves I-EPA Loan Agreement Anticipated April 15, 2013 <br /> Advertise for Bids May, 201 <br /> Pre-Bid Conference June, 201 <br /> I-EPA Construction Permit Issued June, 201 <br /> Bids Opened by the City June, 201 <br /> City Council Receives and Approves Bids July, 2013 <br /> The Loan is Authorized by the IEPA July, 2013 <br /> Notice of Award Issued to Contractors July, 2013 <br /> I-EPA Approves Bids and Authorizes Final Award August, 2013 <br /> Notice to Proceed is Issued to the Contractor August/September, 2013 <br /> Project Completion Summer 2014 <br /> / Page 4 <br />