Laserfiche WebLink
I <br /> Municipality L Name <br /> City of Decatur O lkxAs Deparbyvmt C Chastain &Associates, LLP <br /> C Of Im pOrt'3bw O <br /> Township <br /> A N Address <br /> S <br /> LPreliminary Engineering U 5 North Country Club Road <br /> A Services Agreement L <br /> County G For T city <br /> Macon E Motor Fuel Tax Funds A Decatur <br /> N N <br /> Section C T State <br /> 13-00325-00-BR Y Illinois <br /> THIS AGREEMENT is made and entered into this 16`" day of Sept. 2213 between the above Local <br /> Agency(LA)and Consultant(ENGINEER)and covers certain professional engineering serviqes in connection with the <br /> improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State bf Illinois under the general <br /> supervision of the State Department of Transportation, hereinafter called the"DEPARTMENT;", will be used entirely or in part <br /> to finance ENGINEERING services as described under AGREEMENT PROVISIONS. <br /> Section Description <br /> Name Mound Road over Spring Creek East Bridge Improvement Structure No. 058-3037 <br /> Route Mound Rd Length Mi, 118.70 FT (Strubture No. 058-3037 ) <br /> Termini <br /> Description: <br /> Design superstructure replacement to include topographic surveys, hydraulic surveys, report preparation, design drawings <br /> and specifications, and construction assistance. <br /> Agreement Provisions <br /> The Engineer Agrees, <br /> 1. To perform or be responsible for the performance of the following engineering services fdr the LA, in connection with the <br /> proposed improvements herein before described, and checked below: <br /> a. ® Make such detailed surveys as are necessary for the preparation of detailed roadway plans <br /> b. ® Make stream and flood plain hydraulic surveys and gather high water data, and flood histories for the preparation <br /> of detailed bridge plans. <br /> c. ❑ Make or cause to be made such soil surveys or subsurface investigations including' borings and soil profiles and <br /> analyses thereof as may be required to furnish sufficient data for the design of thelproposed improvement. <br /> Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. <br /> d. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to <br /> furnish sufficient data for the design of the proposed improvement. <br /> e. ❑ Prepare Army Corps of Engineers Permit, Department of Natural Resources-Offico of Water Resources Permit, <br /> Bridge waterway sketch, and/or Channel Change sketch, Utility plan and locations, and Railroad Crossing work <br /> agreements. <br /> f. ® Prepare Preliminary Bridge design and Hydraulic Report, (including economic analysis of bridge or culvert types) <br /> and high water effects on roadway overflows and bridge approaches. <br /> g. ® Make complete general and detailed plans, special provisions, proposals and esti6ates of cost and furnish the LA <br /> with five (5)copies of the plans, special provisions, proposals and estimates. Additional copies of any or all <br /> documents, if required, shall be furnished to the LA by the ENGINEER at his actuol cost for reproduction. <br /> h. ❑ Furnish the LA with survey and drafts in quadruplicate of all necessary right-of-way dedications, construction <br /> easement and borrow pit and channel change agreements including prints of the dorresponding plats and staking <br /> as required. <br /> Note: Four copies to be submitted to the Regional Engineer <br /> Printed 9/10,12013 Page 1 of 5 BLR 05510(Rev- 11106) <br />