My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-85 RESTORATION OF STREETS AND HIGHWAYS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-85 RESTORATION OF STREETS AND HIGHWAYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
8/17/2015 9:19:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-85
Res Ord Title
RESTORATION OF STREETS AND HIGHWAYS BY MUNICIPALITY
Approved Date
8/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illinois Department Local Agency <br /> of Transportation Proposal Bid Bond <br /> Route Various <br /> County Macon <br /> RETURN WITH BID Local Agency City of Decatur <br /> Section 13-00308-00-FP <br /> PAPER BID BOND <br /> WE Illinois Valley Paving, a Division of United Contractors Midwest, Inc. as PRINCIPAL, <br /> and Travelers Casualty&Surety Company of America <br /> as SURETY, <br /> are held jointly,severally and firmly bound unto the above Local Agency(hereafter referred to as 1K)in the penal sum of 5%of the total bid price, or for <br /> the amount specified in the proposal documents in effect on the date of invitation for bids whichever is the lesser sum. We bind ourselves,our heirs, <br /> executors, administrators,successors, and assigns,jointly pay to the LA this sum under the conditions of this instrument. <br /> WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that,the said PRINCIPAL is submitting a written proposal to the LA acting <br /> through its awarding authority for the construction of the work designated as the above section. <br /> THEREFORE if the proposal is accepted and a contract awarded to the PRINCIPAL by the LA for the above designated section and the PRINCIPAL <br /> shall within fifteen(15)days after award enter into a formal contract,furnish surety guaranteeing the faithful performance of the work, and furnish evidence <br /> of the required insurance coverage,all as provided in the"Standard Specifications for Road and Bridge Construction"and applicable Supplemental <br /> Specifications,then this obligation shall become void;otherwise it shall remain in full force and effect. <br /> IN THE EVENT the LA determines the PRINCIPAL has failed to enter into a formal contract in compliance with any requirements set forth in the <br /> preceding paragraph,then the LA acting through its awarding authority shall immediately be entitled to recover the full penal sum set out above,together <br /> with all court costs,all attorney fees,and any other expense of recovery. <br /> IN TESTIMONY WHEREOF,the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their <br /> respective officers this 7th day of August,2013 <br /> Principal <br /> Illinois Valley Paving Co. <br /> ( pany Name) (Company Name) <br /> By: t 2A t-k� 11 By: <br /> (Signature and Title) � (Signature and itle) <br /> (If RINCIPLE is a joint venture of two or more contractors,the company names,and a orized signatures of each c tractor t b affixed.) <br /> Surety n <br /> Travelers Casualty& Surety Company of America By: <br /> (Name of Surety) (Signature of Attorney n-F t) <br /> STATE OF ILLINOIS, <br /> COUNTY OF Macon <br /> 1. Barbara Rose a Notary Public in and for said county, <br /> do hereby certify that James P Bruner and Ronald A Koopman <br /> (Insert names of individuals signing on behalf of PRINCIPAL&SURE ) <br /> who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and <br /> SURETY,appeared before me this day in person and acknowledged respectively,that they signed and delivered said instruments as their free and <br /> voluntary act for the uses and purposes therein set forth. <br /> Given under my hand and notarial seal this 7th day of Aug st, 2013 <br /> My commission expires May 14, 2017 <br /> ELECTRONIC BID BOND <br /> ❑ Electronic bid bond is allowed(box must be checked by LA if electronic bid bond iallowed ARBARA A ROSE <br /> The Principal may submit an electronic bid bond, in lieu of completing the above section of th Pr i d i <br /> an electronic bid bond ID code and signing below,the Principal is ensuring the identified ele <br /> the Principal and Surety are firmly bound unto the LA under the conditions of the bid bond as shown above', (If PRINCIPAL is-a joint <br /> venture of two or more contractors, an electronic bid bond ID code,company/Bidder name title and date must be affixed for each <br /> contractor in the venture.) <br /> Electronic Bid Bond ID Code (Company/Bidder Name) <br /> (Signature and Title) Date <br /> Page 1 of 1 BLR 12230(Rev.7/05 <br /> Printed on 7/31/2013 2:42:19 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.