My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 11:07:18 AM
Creation date
8/17/2015 11:07:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-74
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR LAKE DECATUR DAM REPAIRS PROJECT - PHASE II
Department
Public Works
Approved Date
7/15/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> ' City of Decatur <br /> Lake Decatur Dam Repairs <br /> City Project 2012-25 <br /> ' May 28, 2013 <br /> ADDENDUM N0. 3 <br /> ' TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> LAKE DECATUR DAM REPAIRS <br /> CITY PROJECT 2012-25 <br /> DATED MAY 28, 2013 <br /> ' AD-3-1 NOTICE <br /> 3.01 This Addendum No. 3, dated May 28, 2013, to the Plans, Speci cations, and <br /> Contract Documents for the above captioned project, supersedesll contrary and <br /> conflicting information of the above mentioned project documents, which are <br /> hereby supplemented in certain particulars as follows: 1 <br /> AD-3-2 ALTERNATE BID ITEM No. A-5 <br /> ' 3.02 This alternate contains the option for an engineered system for scour protection in <br /> lieu of placing Stone Dumped Riprap 24 in. and 36 in. Diameter. <br /> ' Sheet C4: In lieu of placing Stone Dumped Riprap as shown below the spillway <br /> apron, contractor may install an engineered system for scour prot ction within the <br /> same limits shown on the plan for riprap placement. The system shall be designed <br /> ' by the contractor and shall be subject to approval of the Engineer. <br /> The engineered scour protection system shall be designed to mee�the following <br /> ' conditions: <br /> 1. Capable of providing hydraulic stability under peak velo ties of 20 feet per <br /> second. <br /> 2. Capable of withstanding peak shear stresses of 21 pounds per square foot. <br /> 3. All systems shall have a minimum factor of safety of 3.5. <br /> An acceptable system would be a combination of an Articulated Concrete Block <br /> ' (ACB) Mat System meeting the design standards of Shoretec SD 900 OCT, <br /> Armortec Armor Flex 70-T,or equivalent and Concrete Armor nits meeting the <br /> design standards of Shoretec ShoreJax, Armor Flex A-Jacks, or equivalent. The <br /> ' materials and configuration of ACB and concrete armor unit systems shall be <br /> designed and specified by the manufacturer and performance testing data in <br /> accordance with the hydraulic performance testing protocol esta ished by the U.S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.