Laserfiche WebLink
I <br /> CITY OF DECATUR, ILLINOIS <br /> DEPARTMENT OF PUBLIC WORKS <br /> ' for <br /> LAKE DECATUR DAM REPAIRS <br /> CITY PROJECT 2012.25 <br /> BASE BID PAY <br /> ITEM DESCRIPTION UNIT QTY UNt PRICE EXTENSION <br /> 1 Mobilization L SUM 1 <br /> ' 2 Downstream Spillway Face Pre-Placed Aggregate CU FT 571.2 <br /> Concrete Repair <br /> 3 Chemical Grout Crack Injection L SUM 1 <br /> 4 Chemical Grout Crack Injection-Material GALLON 35.0 <br /> 5 Joint Sealant FOOT 199.2 <br /> ' 6 Stone Dumped Riprap, 36 in. Diameter TONS 8,634 <br /> 7 Stone Dumped Riprap, 24 in. Diameter TONS 16,555 <br /> 8 Dewatering L SUM 1 <br /> 9 Fish Barrier L SUM 1 <br /> ' 10 Metal Bar Grating SQ FT 1,622 <br /> 11 Concrete Slab Partial Depth Removal L SUM 1 <br /> ' 12 Concrete Slab Replacement SQ FT 269.5 <br /> 13 Steel Railing Removal L SUM 1.0 <br /> 14 Steel Railing LIN FT 103.67 <br /> ' 15 Fence Removal L SUM 1 <br /> 16 Fence Replacement, Chain Link 8 ft LIN FT 32.75 <br /> ' 17 Fixed Access Ladder EACH 1 <br /> 18 Water Main Pipe, 24 in., Diameter HDPE LIN FT 550 <br /> 19 Water Main Pipe, 12 in., Diameter HDPE LIN FT 1,100 <br /> 20 Existing Utility Pipe Removal LIN FT 1950 _ <br /> ' 21 Sluice Gate Control Building Wall Repair L SUM 1 <br /> 22 Tailwater Dam Removal L SUM 1 j <br /> 23 Concrete Repair CU FT 3.0 <br /> i <br /> 24 Slab-On-Grade SQ FT 171.5 <br /> ' 25 Slope Protection Pavement Removal SQ YD 426.0 <br /> 26 Slope Protection Pavement Removal For Repairs SQ YD 12.0 <br />