Laserfiche WebLink
i <br /> ' City of Decatur <br /> Lake Decatur Dam Repairs <br /> ' <br /> City Project 2012-25 <br /> i May 31, 2013 <br /> ADDENDUM N0. 4 <br /> TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMEN S FOR: <br /> ' LAKE DECATUR DAM REPAIRS <br /> CITY PROJECT 2012-25 <br /> ' DATED MAY 31, 2013 <br /> i <br /> a <br /> ' AD-4-1 NOTICE <br /> I <br /> 4.01 This Addendum No. 4, dated May 31, 2013, to the Plans, Speci ations, and <br /> ' Contract Documents for the above captioned project, supersedes all contrary and <br /> conflicting information of the above mentioned project documents, where are <br /> hereby supplemented in certain particulars as follows: <br /> ' AD-4-2 CLARIFICATION OF ALTERNATE BID ITEM No. A-5 <br /> ' 4.02 In addition to the description of Alternate Bid Item A-5 in Adden um No. 3, all <br /> excavation and grading necessary to complete this item shall be ' cidental to the <br /> engineered scour protection system. Excavation requirements arl expected to be <br /> ' similar to those shown on Sheet C4. <br /> i <br /> ' AD-4-3 SPECIFICATION SECTION 31200—EARTH MOVING <br /> ' 4.03 Revise Part 3.10.A to read "Remove all surplus soil and waste m terials and <br /> legally dispose of them off Owner's property." <br /> 4.04 Delete Part 3.1 O.B and subparagraphs. <br /> ' Please make proper acknowledgment of Addendum#4 on page 12 of your bidding documents. <br /> i <br /> END OF ADDENDUM NO. 4 <br /> 1 <br /> City Engineer: Date: <br /> v <br />