My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 11:07:18 AM
Creation date
8/17/2015 11:07:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-74
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR LAKE DECATUR DAM REPAIRS PROJECT - PHASE II
Department
Public Works
Approved Date
7/15/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> THIS CONTRACT, made and entered into this 15th day of July, 2013, by and between the <br /> City of Decatur, Illinois, hereinafter called "Owner", and Engineering & Construction Innovations, <br /> Inc., hereinafter called the"Contractor". <br /> ' WITNESSETH: <br /> ' That for and in consideration of the payments, covenants, and agreements stated herein, the <br /> Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a Good and Workmanlike Manner all <br /> Work required in connection with "LAKE DECATUR DAM REPAIRS, CITY <br /> PROJECT 2012-25," all in strict accordance with the Contract Documents, including <br /> ' any and all Addenda prepared by the City Engineer, with specifications and drawings <br /> are made a part of this Contract; and in strict compliance with the Contractor's Bid <br /> ' Proposal and the other Contract Documents herein mentioned, which are a part of the <br /> Contract; and the Contractor shall do everything required by this Contract and the <br /> other documents constituting a part thereof. <br /> ' 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract, or <br /> ' as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written Notice <br /> ' to Proceed from the Owner to the Contractor. Upon receipt of said Notice, the <br /> Contractor shall diligently and continuously prosecute and substantially complete all <br /> Work under this Contract. <br /> t4. A Completion Date is in effect for this project in accordance with Section 108 of <br /> the Illinois Department of Transportation, Standard Specifications for Road and <br /> ' Bridge Construction. The Completion Date for this project is September 5, 2014. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> ' Contract Documents, all of which are as full a part of this Contract as if herein set out <br /> verbatim, or if not attached, as if hereto attached: <br /> ' Advertisement for Bids Contract Bond <br /> Information for Bidders General Conditions <br /> Bid Proposal Special Conditions <br /> ' Non-Collusion Affidavit Standard Specifications <br /> Responsible Bidder Certification Special Provisions <br /> Contract(This Instrument) Technical Specifications & Drawings <br /> Contract Change Orders <br /> Addenda Number 1, Dated May 9, 2013, Addenda Number 2, Dated May 22, 2013, <br /> Addenda Number 3, Dated May 28, 2013, Addenda Number 4, Dated May 31, 2013. <br /> r16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.