Laserfiche WebLink
Project Name: Lake Shore Drive Sewer Rehabilitation <br /> DIVISION C Engineers Estimate Insituform Technologies, SAK Construction,LLC Michels Corporation Hoerr Construction,Inc. <br /> Project Number. 2012-06 USA,LLC 864 Hoff Road, 817 W Main Street 1601-0 W Luthy Drive <br /> 17988 Edison Ave O'Fallon,MO 63366 PO Box 128 Peoria,IL 61615 <br /> Bainbridge,Gee,Milanski Chesterfield,MO 63005 Brownsville,WI 53006 <br /> Bid Date: Friday,June 21,2013 &Associates,Inc. ph 636.385.1000 <br /> ph 309.691.6653 <br /> (BGM) ph 314.409.5069 fax 636.385.1100 ph 920.924.4300 fax 309.691.6739 <br /> Time: 10:00 A.M. 1670 S Taylorville Rd fax 636.530.8701 fax 920.924.4323 <br /> Decatur,IL 62521 Boyd Hirtz,VP Max P.Hoerr II <br /> Fund: Sewer Fund Contingent on EPA Loan Gary Penrod bhirtzbsakcon.com Patrick Herzog,VP Mike Kaisner <br /> David Harp 9oenrod0insituform.com cpreston(&rnichels.us mkaisner(ftoerr.com <br /> Organization Code: 217.423.8600 <br /> Object Code: <br /> QTY t)t nitl?t(Ipe: Tq If t t TOW -° 1 '�4 <br /> t! <br /> 1 MOBILIZATION I. LSUM $35,000.00 $35,000.0 $94,000.00 $94,000. $21,000.00 $21,000.0 $89,514.00 $89,514. $98,000.00 000.001 <br /> 2 EWER CLEANING,36 INCH 10,943. FT $12.00 $131,316.0 $13.00 $142,259. $25.50 $279,046. $37.00 $404,891. $39.00 $426,777.001 <br /> 3 EWER CLEANING,30 INCH 235. FT $8.00 $1,880.0 $12.00 $2,820. $25.50 $5,992. $61.00 $14,335. $62.50 $14,687.501 <br /> 4 EWER PIPE LINING,36 INCH 10,837. FT $150.00 $1,625,550.0 $120.00 $1,300,440. $136.00 $1,473,832.0 $180.00 $1,950,660. $185.00 $2,004,845.001 <br /> 5 SEWER PIPE LINING,30 INCH 235. FT $125.00 $29,375.0 $97.00 $22,795. $120.00 $28,200.0 $155.00 $36,425. $180.00 $42,300.001 <br /> 6 REINSTATE SERVICE LATERALS 43. EA $150.00 $6,450.0 $300.00 $12,900. $250.00 $10,750.0 $320.00 $13,760. $300.00 $12,900.0 <br /> 7 FIBER REINFORCED SHOTCRETE,2 INCH 8,673. SF $24.00 $208,152.0 $27.00 $234,171. $28.50 $247,180. $60.00 $520,380. $62.00 $537,726.0 <br /> 8 MANHOLE RAISING,ET-26 1. LSUM $2,500.00 $2,500.0 $3,500.00 $3,500. $2,000.00 $2,000.0 $1,680.00 $1,680. $2,000.00 $2,000.001 <br /> 9 MANHOLE RAISING,ET-37 1. LSUM $2,000.00 $2,000.0 $3,500.00 $3,500. $2,000.00 $2,000.0 $1,680.00 $1,680. $2,000.00 $2,000.0 <br /> 10 MANHOLE RAISING,ET-38 1. LSUM $2,000.00 $2,000.0 $3,500.00 $3,500. $2,000.00 $2,000.0 $1,680.00 $1,680. $2,000.00 $2,000.0 <br /> 11 MANHOLE CASTINGS AND LIDS 27. EA $2,000.00 $54,000.001 $2,200.00 $59,400.ON $1,750.00 $47,250.0 $1,550.00 $41,850. $2,400.00 $64,800.0 <br /> 12 TELEVISING,PRE-REHABILITATION 11,178. FT $2.00 $22,356. $1.00 $11,178. $1.00 $11,178.0 $2.50 $27,945. $3.00 $33,534.0 <br /> 13 TELEVISING,POST-REHABILITATION 11,178.01 FT $2.00 $22,356.001 $0.25 $2,794.0 $1.00 $11,178.0 $2.50 $27945. $3.00 $33,534.0 <br /> 14 TRAFFIC CONTROL COMPLETE 1. LSUM $10,000.00 $10,000.0 $20,000.00 $20,000. $5,000.00 $5,000.0 $16,113.00 $16,,113. $15,000.00 $15,000.0 <br /> 15 L WAN E F R RAILR AD EXPENSES 1. LSUM $10,000.00 $10,000.0 $10,000.00 $10,000. $10,000.00 $10,000.0 $10,000.00 $10,000. $10,000.00 $10,000.0 <br /> r0.:TAL=BID;S9 AS CORRECTED 521629350 51,923,257. =2156607. =3,158,858. 53,300,103. <br /> nt Ovr Under ENGINEER'S ESTIMATE -11.08% -0.29% 48.04% 52.58% <br /> 6- Zi-i3 <br /> Matthew C.Newel,P.E.,City Engineer Date <br /> Page 1 of 1 <br />