My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-68 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-68 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 3:13:08 PM
Creation date
8/17/2015 2:43:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-68
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR A SEGMENT OF LAKE SHORE DRIVE SEWER REHABILITATION PROJECT - DIVISION B
Department
Public Works
Approved Date
7/1/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED JUNE 17, 2013 RETURN WITH BID <br /> BID SCHEDULE <br /> ' CITY OF DECATUR, ILLINOIS <br /> LAKE SHORE DRIVE SEWER REHABILITATION <br /> **A bid does not have to be submitted for each Division of work. Complete <br /> proposal forms only for the Division or Divisions of work you wish to bid.** <br /> rDIVISION C (Complete only if bidding on Division C) <br /> Item Description Quantity Units Unit Price Total <br /> 1 Mobilization 1.0 LSUM 44 9,4000.1m -74vcr,4!),& <br /> 2 Sewer Cleaning, 36" 10,943 FT 4511 /r/Z Z5%vo <br /> ' 3 Sewer Cleaning, 30" 235 FT <br /> 4 Sewer Pipe Lining, 36" 10,837 FT 12,v-cw ;�v,v <br /> 5 Sewer Pipe Lining, 30" 235 FT 9'7 00 227 0.Or <br /> 6 Reinstate Service Laterals 43 EA <br /> 7 Fiber Reinforced Shotcrete, 2" 8,673 SF41 2-7 ov -4 0,1 l7!-o0 <br /> 8 Manhole Raising, ET-26 1.0 LSUM ,,,a,3 •A - Sc�o0 <br /> 9 Manhole Raising, ET-37 1.0 LSUM 3_"�W.ow 3 w. <br /> 10 Manhole Raising, ET-38 1.0 LSUM . � � <br /> 11 Manhole Castings and Lids 27 EA 7" 2vo <br /> ✓�, 4�0-av <br /> ' 12 Televising, Pre-Rehabilitation 11,178 FT 17,9•e, <br /> 13 Televising, Post-Rehabilitation 11,178 FT D, 2 2 7,Vit 57a <br /> 14 Traffic Control Complete 1.0 LSUM 20 'Lv oao ov <br /> 15 Allowance for Railroad Expenses 1.0 LSUM 10,000.00 10,000.00 <br /> Contractor's Total Proposal for Division C 2 A 2 S <br /> Only CIPP is allowed in pipes of 36" diameter or less. <br /> CITY 2012-06/BGM 12-043 PROP-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.