My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-68 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-68 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 3:13:08 PM
Creation date
8/17/2015 2:43:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-68
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR A SEGMENT OF LAKE SHORE DRIVE SEWER REHABILITATION PROJECT - DIVISION B
Department
Public Works
Approved Date
7/1/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 4 - SPECIAL CONDITIONS OF THE CONTRACT <br /> Article No. Title Page <br /> SC-1 Notice SC-1 <br /> SC-2 Fair Employment Practices SC-1 <br /> SC-3 Insurance SC-1 <br /> SC4 Prevailing Wage Rates SC-3 <br /> SC-5 Liquidated Damages SC4 <br /> SC-6 Sanitary Conveniences SC4 <br /> SC-7 Utilities for Construction Purposes SC-4 <br /> SC-8 Preservation: Trees, Shrubs,Grass, Etc. SC-5 <br /> SC-9 Extra Bid Form SC-5 <br /> SC-10 Contract Performance and Contract Payment Bond SC-5 <br /> SC-11 Certified Payroll Required SC-6 <br /> SC-12 Illinois Law Applicable to Project SC-6 <br /> SC-13 Video of Existing Conditions SC-7 <br /> SC 14 Contractor Payments <br /> SC-7 <br /> SC-15 Use of Fire Hydrants SC-7 <br /> SC-16 Cooperation& Scheduling Between Contractors SC-8 <br /> SC-17 Easements and Rights-of-Way SC-8 <br /> SC-18 Project Schedule SC-9 <br /> SC-19 Chemical Analysis of Sewage SC-9 <br /> SC-20 Qualification of Bidders SC-10 <br /> SC-21 Sewer Lining Methods SC-11 <br /> SC-22 Access Pits and Openings to the Sewer SC-12 <br /> SC-23 Flow By-Passing SC-13 <br /> SC-24 Mobilization SC-13 <br /> SC-25 Manhole Casting and Cover Replacement SC-13 <br /> SC-26 Buried and Difficult Access Manholes SC-14 <br /> SC-27 Traffic Control Complete SC-16 <br /> SC-28 Special Structure No.5 /WT-11 SC-16 <br /> SC-29 Allowance For Railroad Expenses (Division C) SC-17 <br /> SC-30 Sewer and Manhole Information SC-17 <br /> SC-31 Lay Down Area SC-18 <br /> SC-32 Diverting Flow to a Parallel Sewer(Div. C) SC-18 <br /> SC-33 Construction Noise SC-19 <br /> EXHIBIT A: Prevailing Wage, General Decisions IL 130005 & IL 130015 <br /> EXHIBIT B: IDOT Standards <br /> 442001-04 Class A Patches <br /> 701301-04 Lane Closure, 2L, 2W Short Time Operations <br /> 701602-06 Urban Lane Closure,Multilane, 2W with Bidirectional Left Turn Lane <br /> 701606-08 Urban Lane Closure,Multilane, 2W with Mountable Median <br /> 701701-08 Urban Lane Closure,Multilane Intersection <br /> 701901-02 Traffic Control Devices <br /> EXHIBIT C: IDOT Construction Permit <br /> EXHIBIT D: Special Structure No. 5/WT-11 <br /> EXHIBIT E: Application For Right-Of-Entry, CSX Transportation <br /> BGM 12-043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.