' Y CONTRACT <br /> THIS CONTRACT, made and entered into this 17th day of June, 2013, by and between the City of <br /> ' Decatur, Illinois, hereinafter called "Owner", and Anderson Electric, Inc., hereinafter called the <br /> "Contractor". <br /> ' WITNESSETH: <br /> That for and in consideration of the payments, covenants, and agreements stated herein, <br /> ' the Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a Good and Workmanlike Manner all <br /> Work required in connection with "DECATUR MUNICIPAL SERVICES <br /> CENTER — EMERGENCY GENERATOR REPLACEMENT", CITY <br /> PROJECT 2012-35, all in strict accordance with the Contract Documents, including <br /> ' any and all Addenda prepared by the City Engineer, with specifications and drawings <br /> are made a part of this Contract; and in strict compliance with the Contractor's Bid <br /> Proposal and the other Contract Documents herein mentioned, which are a part of the <br /> Contract; and the Contractor shall do everything required by this Contract and the <br /> other documents constituting a part thereof. <br /> ' 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract, or <br /> as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written Notice <br /> to Proceed from the Owner to the Contractor. Upon receipt of said Notice the <br /> p p , <br /> Contractor shall diligently and continuously prosecute and substantially complete all <br /> ' Work under this Contract. <br /> 4. The Completion Date for this project is: <br /> ' A. Alternate #1: 90 calendar days .from the date the Contractor <br /> receives the Notice to Proceed. <br /> B. Alternate #2: 120 calendar days from the date the Contractor <br /> ' receives the Notice to Proceed. <br /> C. Alternate #3: 120 calendar days from the date the Contractor <br /> receives the Notice to Proceed. If this Alternate is selected, the <br /> contractor shall be provided with Generator and Transfer Switch <br /> Shop Drawings within 30 days of the Notice to Proceed, and the <br /> contractor shall receive the Generator and Transfer Switch within <br /> 90 calendar days from the Notice to Proceed. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> Contract Documents, all of which are as full a part of this Contract as if herein set <br /> out verbatim, or if not attached, as if hereto attached: <br /> ' Advertisement for Bids Performance Bond <br /> Information for Bidders General Conditions <br /> Bid Proposal Special Conditions <br /> ' Non-Collusion Affidavit Standard Specifications & Drawings <br /> Contract (This Instrument) Supplemental Specifications <br /> Contract Change Orders Appendix(s) <br /> Addenda Number& Date <br /> ' 17 <br />