Affidavit of Availability
<br /> ' Illinois Department For the Letting of Jun 6,2013
<br /> of Transportation (Letting Date)
<br /> ' Bureau of Construction
<br /> 2300 South Dirksen Parkway/Room 322 Instructions: Complete this form by either typing or using black ink.
<br /> Springfield,Illinois 62764 "Authorization to Bid"will not be Issued unless both sides of this form are
<br /> completed In detail. Use additional forms as needed to list all work.
<br /> ' PART I:Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It Is required to include all pending low bids not yet awarded or rejected.
<br /> In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent
<br /> engineers or owners estimate,and must Include work subcontracted to others. If no work Is contracted,show NONE.
<br /> ' 1 2 3 4 5
<br /> City of Urbana- IDOT 95639 FAU 8390 Franklin/Eastwood Southeast Storm Paris High School
<br /> Contract Number' Boneyard Phase II E(Angam,IL Drive Reconsbuclion Drainage Phase I BP-03S Sitelto
<br /> Grading&BP-03 e UUllUes
<br /> Contract With Onell Construction DOTE ham,IL Village of Mahomet,IL Pads Cooperative High
<br /> Champaign,IL a9 Village of Tobno School Board Paris,IL
<br /> Estimated Completion Date September-13 July-13 August-13 June-13 June-14 PAGE 1:
<br /> ' Total Contract Price 1,993,073 3,251,371 1,055,315 2,341,622 2,045,850 CUMULATIVE
<br /> TOTALS
<br /> Uncompleted Dollar Value if Firm is the 1,091 313 632,228 185,965 441,951 2,351,457
<br /> Prime Contractor
<br /> Uncompleted Dollar Value if Finn is the 1,551,593 - - 1,551,593
<br /> Subcontractor
<br /> Total Value of All Work 3,903,050
<br /> ' PART II:Awards Pending and Uncompleted Work to be done with your own forces.
<br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work PAGE 1:
<br /> subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your CUMULATIVE
<br /> company. If no work is contracted,show NONE. TOTALS
<br /> ' Earthwork 234,394 278,200 126,044 76,294 213,444 928,376
<br /> Portland Cement Concrete Paving 146,309 146,309
<br /> HMA Plant Mix
<br /> HMA Paving
<br /> Clean&Seal Cracks/Joints
<br /> Aggregate Bases&Surfaces 46,918 125,430 59,683 44,082 276,112
<br /> ' Highway,R,R,,Waterway Structures _
<br /> Drainage 182,595 47,667 35,599 184,866 450,728
<br /> Electrical
<br /> Cover and Seal Coats
<br /> ' Concrete Construction 1,021,015 84,386 222,305 1,327,705
<br /> Landscaping 4,875 4,875
<br /> Fencing
<br /> Guardrail
<br /> ' Painting _
<br /> Signing 8,672 990 9,662
<br /> Cold Milling,Planning&Rotomilling
<br /> ' Demoltion -
<br /> Pavement Marking(Paint) 2,923 2,923
<br /> Other Construction(List) _
<br /> Steel Railing
<br /> ' Mobil,trafticcontr,entrsign,misc 58,000 61,160 23,000 41,141 183,301
<br /> Construction Engineering 10,500 2,500 13,000
<br /> Lime Stabilization 67,482 67,462
<br /> Buliding/Special Structures
<br /> Contingency Allowances
<br /> Totals 1,551,593 664,325 632,228 120,376 441,951 3,410,473
<br /> ' Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code." Failure to comply will result in non-
<br /> issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center.
<br /> ' Printed e/13/2013 Page 1 of 8 BC57(Rev.08/17/10)