' Affidavit of Availability
<br /> Illinois Department For the Letting of Jun 15,2012
<br /> of Transportation (Letting Date)
<br /> Bureau of Construction
<br /> ' 2300 South Dirksen Parkway/Room 322 tions: Complete this form by efth is for ng re using black Ink. "Authorization n Bid"
<br /> Springfield,Illinois 62764 t be Issued unless both aides of this form are completed in detail. Use additional forms
<br /> ' PART I:Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected.
<br /> In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent
<br /> engineer's or owners estimate,and must Include work subcontracted to others. If no work is contracted,show NONE.
<br /> ' 6 7 a 9 10
<br /> Mahomet-Seymour
<br /> Contract Number Innovation Road Phase II Storm Sewer R-33369 Vigo County, CUSD f13-Early EIU-University Courts
<br /> Improvement IN-Hadan Road Learrdng Center Parking Imrpovements
<br /> ' Silework
<br /> Contract WithCity of Rantoul,IL City of Robinson,IL INDOT Indianapolis,IN 8roeren Russo NECO Asphalt Co.
<br /> Champaign,IL Charlasion,IL
<br /> Estimated Completion Date July-13 August-13 June-13 December-13 May-13 PAGE 2:
<br /> Total Contract Price 1,437,775 2,028,262 691,250 1,921,000 324,372 CUMULATIVE
<br /> TOTALS
<br /> Uncompleted Dollar Value if Firm Is the
<br /> Prime Contractor 990,561 718,582 602,513 - 4,663,112
<br /> ' Uncompleted Dollar Value If Firm is the - 1,306,214 235,560 31093 367
<br /> Subcontractor
<br /> Total Value of All Work 7,756,479
<br /> ' PART II:Awards Pending and Uncompleted Work to be done with your own forces.
<br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work PAGE 2:
<br /> subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your CUMULATIVE
<br /> ' company. If no work is contracted,show NONE. TOTALS
<br /> Earthwork 70,270 83,676 129,085 182,221 1,393,627
<br /> Portland Cement Concrete Paving 519,741 359,427 221,531 1,247,008
<br /> HMA Plant Mix
<br /> ' HMA Paving _
<br /> Clean&Seal Cracks/Joints
<br /> Aggregate Bases&Surfaces 235,026 2,170 33,510 39,703 586,521
<br /> Highway,R.R.,Waterway Structures 67,690 67,690
<br /> Drainage 67,463 32,434 276,377 72,664 899,665
<br /> Electrical
<br /> Cover and Seal Coats
<br /> ' Concrete Construction 121,699 83,494 84,699 535,622 162,896 2,316,115
<br /> Landscaping 20,178 9,676 4,710 8,028 47,467
<br /> Fencing 9,936 9,936
<br /> ' Guardrail _
<br /> Painting
<br /> Signing 259 6,688 9,653 26,262
<br /> Cold Milling,Planning&Rotomilling 8,260 8,260
<br /> ' Demoltion _
<br /> Pavement Marking(Paint) 4,888 3,180 10,991
<br /> Other Construction(List) _
<br /> Steel Railing
<br /> ' Mobil,traffic contr,entr sign,misc 4,500 30,000 4,900 222,701
<br /> Construction Engineering 14,000 25,000 52,000
<br /> Lime Stabilization 44,986 42,453 154,921
<br /> ' Building/Special Structures
<br /> Contingency Allowances
<br /> Totals 990,561 718,582 381,775 1,306,214 235,560 1 7,043,164
<br /> ' Disclosure of this Information is REQUIRED to accomplish the statutory purpose as outlined in the'Illinois Procurement Code" Failure to comply will result in nor,
<br /> issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center.
<br /> ' Printed 6/132013 Page 3 of 8 BC57(Rev.08117/10)
<br />
|