Affidavit of Availability
<br /> Illinois Department For the Letting of Jun 5,2013
<br /> of Transportation (Letting Date)
<br /> Bureau of Construction tions: Complete this form by either typing or using black Ink. "Authorization to Bid"will
<br /> ' 2300 South Dirksen Parkway/Room 322 issued unless both aides of this form are completed in detail. Use additional forma as
<br /> Springfield,Illinois 62764
<br /> ' PART I:Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It Is required to include all pending low bids not yet awarded or rejected.
<br /> In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent
<br /> engineer's or owners estimate,and must include work subcontracted to others. If no work Is contracted,show NONE.
<br /> ' 11 12 13 14 15
<br /> IDOT 95696 Moultrie Church-Mathews Street [DOT 91476 Vermilion City of Greencastle,IN-North American Lighting
<br /> Contract Number County Reoonsbuctbn County Edgelea Subdivision Expansion Project-
<br /> Skework Paris,IL
<br /> Contract With IDOT Springfield,IL City of Urbana,IL IDOT Wabash Valley Asphalt Takenska Corporation
<br /> Co.Terre Haute,IN Itasca,IL
<br /> Estimated Completion Date August-13 September-13 October-13 August-13 November-13 PAGE 3:
<br /> ' Total Contract Price 866,162 700,518 1,257,366 340,302 1,560,000 CUMULATIVE
<br /> TOTALS
<br /> Uncompleted Dollar Value If Firm is the 837,562 700,518 1,257,366 7,458,558
<br /> Prime Contractor
<br /> ' Uncompleted Dollar Value if Finn is the _ 340,302 1,560,000 4,993,669
<br /> Subcontractor
<br /> Total Value of All Work 12,452,227
<br /> ' PART 11:Awards Pending and Uncompleted Work to be done with your own forces.
<br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work PAGE 3:
<br /> subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your CUMULATIVE
<br /> ' company. If no work is contracted,show NONE. TOTALS
<br /> Earthwork 74,904 129,122 248,399 455,524 2,301,577
<br /> Portland Cement Concrete Paving 236,222 1,483,229
<br /> HMA Plant Mix -
<br /> ' HMA Paving 2,698 72,475 75,173
<br /> Clean&Seal Cracks/Joints
<br /> Aggregate Bases&Surfaces 51,368 19,570 451,131 1,108,590
<br /> Highway,R.R.,Waterway Structures 67,690
<br /> Drainage 16,595 98,100 158,686 340,302 276,606 1,789,954
<br /> Electrical 40,269 40,269
<br /> Cover and Seal Coats -
<br /> ' Concrete Construction 343,622 166,237 575,344 60,367 3,461,685
<br /> Landscaping 1,900 3,773 14,430 67,570
<br /> Fencing 9,936
<br /> ' Guardrail -
<br /> Painting
<br /> Signing 37,400 520 1,715 65,897
<br /> Cold Milling,Planning&Rotomilling 12,400 20,660
<br /> '
<br /> Demolition
<br /> Pavement Marking(Paint) 17,703 6,600 35,294
<br /> Other Construction(List)
<br /> ' Steel Railing .
<br /> Mobil,traffic contr,entr sign,mise 12,800 4,999 94,000 10,154 344,654
<br /> Construction Engineering 8,000 18,000 7,300 85,300
<br /> Lime Stabilization 154,921
<br /> Building/Special Structures
<br /> Contingency Allowances
<br /> Totals 487,221 700,518 1,257,366 340,302 1,283,627 11,112,398
<br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the'Illinois Procurement Code." Failure to comply will result in non-
<br /> issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center.
<br /> Printed 8/132013 Page 5 of 8 SC67(Rev.08N7/10)
<br />
|