My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-50 AUTHORIZING AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-50 AUTHORIZING AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:01:32 AM
Creation date
8/18/2015 11:00:58 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-50
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. TO DESIGN THE UNION STREET SEWER REHABILITATION
Department
Public Works
Approved Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> UNION STREET SEWER REHABILITATION <br /> DESIGN ENGINEERING <br /> SCOPE OF WORK <br /> The project is to be known as UNION STREET SEWER REHABILITATION. The PROJECT shall <br /> consist of the design of the rehabilitation improvements to the City owned Union Street Sewer as outlined <br /> in the City of Decatur's Critical Sewer Rehabilitation Facilities Plan Amendment dated February 2012 by <br /> Bainbridge, Gee,Milanski&Associates. The project will be bid as a single project. This project is <br /> expected to be funded with an Illinois EPA SRF loan. <br /> THEREFORE,In Consideration of these premises and the mutual covenants of the above described <br /> PROJECT: <br /> THE ENGINEER AGREES, <br /> 1. Proiect Engineering Services-To perform or be responsible for the performance of the <br /> following professional engineering services for the OWNER in connection with the design of the <br /> proposed projects hereinbefore described: <br /> a. Make such detailed surveys as are necessary for the preparation of detailed construction <br /> plans. <br /> b. Prepare detailed rehabilitation construction drawings and specifications in such a manner <br /> as to permit the OWNER to obtain construction bid prices for the above described <br /> PROJECT. <br /> C. Prepare proposal forms,notice to bidders, and the Contract Documents. <br /> d. Prepare estimate of project construction cost based on final plans and documents. <br /> e. Furnish copies of the Contract Documents consisting of Construction Agreement Forms, <br /> General Conditions, Special Conditions,Detailed Construction Plans and Specifications <br /> for review by the Owner, and for submission to permitting authorities. <br /> f. Incorporate OWNER's review comments into the final set of contract documents. <br /> g. Assist the OWNER with necessary permit applications to all governmental and other <br /> authorities having jurisdiction to approve portions of the PROJECT such as,but not <br /> limited to,the Illinois Environmental Protection Agency, City of Decatur,Division of <br /> Water Resources, and U.S.Army Corps of Engineers. <br /> h. Provide the OWNER with assistance in obtaining project financing utilizing a loan from <br /> the Illinois Water Pollution Control Revolving Fund. <br /> i. Proiect Time of Performance-To complete the engineering design services within 280 <br /> calendar days from the receipt of a"Notice to Proceed" from the OWNER. <br /> 2. Proiect Required Provisions <br /> a. The ENGINEER agrees to take affirmative steps to assure that disadvantaged business <br /> enterprises are utilized when possible as sources of supplies, equipment,construction, <br /> and services in accordance with the Water Pollution Control Loan Program rules. As <br /> required by the award conditions of USEPA's Assistance Agreement with IEPA the <br /> Last Revised:09-12-2012 A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.