SCOPE OF SERVICES: <br /> Manholes <br /> 1. Physically locate and mark the manholes on the project sewers. (Check the hydrogen sulfide <br /> concentration in the sewer at key manholes.) <br /> 2. Perform a closed level circuit to establish the rim elevations of the manholes on the project <br /> sewers. <br /> 3. Photograph the location of each manhole. Visually inspect the manhole from the surface and note <br /> any irregularities. Measure the depth of each manhole and establish an invert elevation. <br /> 4. From record drawings and measured depths, draft a detail for each manhole. <br /> 5. Review Telescan manhole inspection logs and CCTV files. Mark up manhole drawings with <br /> defects for repair. The City shall furnish current inspection logs and CCTV files for all manholes. <br /> 6. Draft defects onto the manhole detail drawings. <br /> 7. Design the necessary repairs and rehabilitation for each manhole. <br /> 8. Draft the repairs and rehabilitation onto the detail drawings. <br /> 9. Tabulate the manhole repair and rehabilitation quantities. <br /> 10. Write technical specifications for the manhole repair and rehabilitation techniques. <br /> 11. Write special conditions/provisions for specific areas of attention. <br /> 12. BGM will use the City's hydrogen sulfide gas monitors for checking gas concentrations in <br /> manholes. Any cost for calibration and/or repair of the equipment not caused by BGM will be <br /> considered a direct cost of the project. <br /> Trunk Sewer <br /> 1. From record drawings and measured manhole invert elevations, draft a plan and profile for each <br /> sewer at an appropriate horizontal and vertical scale. <br /> 2. Review Telescan CCTV files and reports. Tabulate sewer conditions and defects. The City shall <br /> furnish current inspection logs and CCTV files for all project sewers. <br /> 3. At an estimated 3 locations an internal inspection will be made to verify the condition of the <br /> sewer walls and sewer bottom. The location of the inspections will be made based on the defects <br /> shown on the CCTV files and the accessibility to the sewer. The inspections will be made <br /> upstream and downstream of the entry manholes. These inspections are classified as confined <br /> space entries. The entry will be done with an experienced and trained 6 man crew. Two men will <br /> be inside the sewer, one man at the entry manhole, one man at the emergency exit manhole, and <br /> one man at each of the two ventilation blowers. The crew will be equipped with a personnel <br /> wench,harness,two generators,two blowers, one air quality meter,two emergency air pacts, and <br /> necessary protective ware. <br /> 4. Draft defects, sewer conditions and other information onto the sewer profile drawings. <br /> 5. Design the necessary repairs and rehabilitation for each sewer segment between manholes. <br /> 6. Draft the repairs and rehabilitation onto the sewer profile drawings. <br /> 7. Tabulate the repair and rehabilitation on a schedule of quantities. <br /> 8. Write technical specifications for each of the sewer repair and rehabilitation techniques. <br /> 9. Write special conditions/provisions for specific areas of attention. <br /> Opinion of Probable Cost <br /> 1. An opinion of probable cost will be prepared for the project sewers. Most of the items will be <br /> based on estimated quantities and projected unit costs. <br /> Technical Peer Review <br /> 1. Perform an in house peer review by an engineer and technical staff who have not worked on the <br /> project. <br /> Last Revised:09/12/2012 <br />