Laserfiche WebLink
Exhibit H <br /> Exhibit H <br /> DIRECT HOURLY LABOR COSTS OF THE CONSULTING ENGINEER <br /> As of the date of this contract. <br /> Project Name: Lake Shore Drive Sewer Rehabilitation, 2012-06 <br /> Consulting Engineer: <br /> Classification Minimum Maximum <br /> Sr.Principal 50.84 50.84 <br /> Sr.Project Engineer 40.67 45.76 <br /> Professional Land Surveyor 35.48 39.52 <br /> Technician/Draftsman 31.49 31.49 <br /> Senior Technician 22.02 27.45 i <br /> Technician 17.50 20.72 <br /> Field Assistant 11.00 12.00 <br /> i <br /> Clerical 17.60 17.60 <br /> I <br /> I <br /> I <br /> I <br /> i <br /> H-1 <br /> i <br /> I <br />