Page No. 2 <br /> Log No. C-0605-03 <br /> 3. Any spoil material excavated, dredged or otherwise produced must not be returned to the waterway <br /> but must be deposited.in a self-contained area in compliance with all state statues,regulations and <br /> permit requirements with no discharge to waters of the State unless a permit has been issued by this <br /> Agency. Any backfilling must be done with clean material and placed in a mariner to prevent <br /> violation of applicable water quality standards. <br /> 4. All areas affected-by.construction shall be mulched and seeded as soon after construction as possible. <br /> The applicant shall undertake necessary measures and procedures to reduce erosion during <br /> construction. Interim measures to prevent erosion during construction shall be taken and may include <br /> the installation-of staked straw bales',sedimentation basins and temporary mulching....All construction <br /> within-the waterway shall be constructed during zero or low flow conditions. The,applicant shall be <br /> responsible for obtaining an NPDES Storm Water Permit prior to initiating construction if the , <br /> construction activity associated with the project.will result in the disturbance.-of 1 (one)or more acres, <br /> total land area on-or after March 10,'2003. An NPDES Storm Water Permit-may be obtained by <br /> submitting a properly completed Notice of Intent(NOI)form by certified mail to-the Agency's <br /> Division of Water Pollution Control' Permit Section. <br /> 5. The applicant shall irriplem'ent erosion control measures consistent with the".Illinois Urban Manual" <br /> (IEPA/USDA,'NRCS;2002). <br /> 6. Asphalt,bituminous material and concrete with protruding material such as reinforcingbar or mesh <br /> shall not be.1)used for backfill,2)placed on shorelinesistreambanks, or 3)placed:in waters of the . <br /> - I <br /> State. <br /> 7. The proposed work shall be constructed with adequate erosion-control measures (i.e:, silt.fences, <br /> straw bales,etc.)to prevent transport of sediment and materials downstream. <br /> I <br /> 8. The fill material used for the construction of-the temporary dams shall-be predominantly Sand or I <br /> larger size material,with<20%o.passing a.,#23 0 U.S.sieve. <br /> 9. The applicant shall monitor the surface water for dissolved oxygen.(DO),pH,andtemperature at <br /> locations upsteam of each temporary•dam and.locations downstream of each.temporary dam <br /> representative.of the water quality in each area. Prior to construction of the dams,at each sample <br /> location,the applicant shall monitor for the above parameters at near surface,and at mid-depth. <br /> Samples shall betaken within 1 hour before sunrise and at mid-.afternoon. In the pre-construction <br /> phase sampling shall be conducted a minimum one.day per week fortwo weeks. After construction <br /> of the dams,the applicant shall monitor the above parameters-at the same locations at a frequency of <br /> once every week when water levels are below the top of the dams and until the dams are removed. If <br /> any analysis results show less than 6 mg/L DO,hourly sampling shall be conducted until monitoring <br /> shows that the dissolved oxygen standard has been met. Monitoring records shall be kept oftime, <br /> place,method of measurement, and who made the measurement for each sample taken.The applicant j <br /> shall submit monitoring reports of the analysis results by the 15`x'of the month following the month ofin <br /> ' <br /> the collection of the samples to.the following address: <br /> j <br /> Illinois-Environmental Protection Agency <br /> Bureau of Water <br /> Watershed Management Section <br /> 1021 North Grand Avenue East <br /> Post Office Box 19276 i <br /> Springfield,Illinois 62794-9276 <br />