My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-01 AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-01 AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 2:50:41 PM
Creation date
8/19/2015 2:50:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-01
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO PROVIDE A PRELIMINARY DESIGN TO IMPROVE THE MOUND ROAD BRIDGES OVER SPRING CREEK
Department
Public Works
Approved Date
1/7/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit it <br /> City of Decatur.Assessment of Mound Road Bridges-Phase 1 Engineering <br /> Manhour and Fee Estimate <br /> SN 056.3035.058-3036,and 056-3037 <br /> Cost <br /> Code Activity PM En Sr.En SE Tech Survey Totals <br /> 00100 Project Admin&Coordination <br /> Project Initiation Paperwork 2.0 2.0 <br /> Prepare Safe Work Plan 2.0 2.0 <br /> Prepare PXP 3.0 3.0 <br /> Project Kickoff Meeting 1.0 1.0 0.0 2.0 <br /> Project Administration/Invoicing 8.0 8.0 <br /> Total 16.0 0.0 1.0 0.0 0.0 0.0 17.0 <br /> 00200 Review Existing Data <br /> Existing Bridge&Roadway Plans 2.0 4.0 6.0 <br /> Inspection Reports 1.0 2.0 3.0 <br /> Total 0.0 1 0.0 3.0 6.0 0.0 0.0 9.0 <br /> 00300 Brid a Site Visit <br /> Document structure condition 8.0 8.0 16.0 <br /> Total 0.0 0.0 8.0 8.0 0.0 0.0 16.0 <br /> 00400 Preare Bridge Condition Report <br /> Structure Evaluation 9.0 12.0 21.0 <br /> Prepare Report&Exhibits 72.0 12.0 84.0 <br /> Prepare Cost Estimates 18.0 6.0 24.0 <br /> Select Scope of Work 3.0 2.0 5.0 <br /> Total 0.0 0.0 102.0 32.0 0.0 0.0 134.0 <br /> 00500 QAIQC <br /> ITR-BCR 6.0 6.0 <br /> Total 6.0 0.0 0.0 0.0 0.0 0.0 6.0 <br /> MH Totals 22 0 0 0 1 1- .0 460 00 00 132 0 <br /> Rate $64.64 $30.00 S33 00 S64 64 S33.0C $29.00 <br /> Salary Costs $1,422.08 $0.00 53.762.00 1$2,973.44 1 $0.00 $0.00 $8,157.52 <br /> Direct Costs <br /> Mileage(Survey); 1 trip(s)x 5 miles/trip @ 50.555 !mile = $2.78 <br /> Postage, $50.00 <br /> Total Direct Costs= $52..78 <br /> Estimated Fee <br /> Salary Multiplier= 2.70 <br /> Labor: $8,157.52 x 2.70 = $22,025.30 <br /> Direct Costs: $52.78 <br /> Total Estimated Fee = $22,078.08 <br /> Say $22,100.00 <br /> A4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.