Mass Transit Memorandum <br /> No. 120712-1 <br /> December 7, 2012 <br /> TO: Honorable Mayor McElroy and City Council <br /> FROM: Ryan McCrady, City Manager <br /> Paul McChancy, Mass Transit Administrator <br /> SUBJECT: Purchase Order for Construction of a Maintenance Storage Building <br /> SUMMARY Staff recommends that Council adopt a Resolution awarding a <br /> RECOMMENDATION: purchase order for construction of a maintenance storage building <br /> to the lowest bidder, Building Systems of Illinois, Inc., at the not-to- <br /> exceed price of$53,450. <br /> BACKGROUND: Maintenance staff wishes to construct a building for the storage of <br /> new and used tires. The maintenance department stores tires on 3 tire <br /> racks,totaling 66' in length. Currently, some tires are stored outside in <br /> the open and some are stored inside, taking up valuable space in the <br /> maintenance shop. Staff believes that it is important to have a storage <br /> facility where all tires can be kept out of the weather and protected from <br /> theft, without blocking areas of the maintenance shop. Staff proposes to <br /> build a 24' by 32' pole barn inside of the existing fenced area between <br /> the maintenance shop and the bus barn. (See attached floor plan and site <br /> plan.) <br /> The City's building codes require that the plans for any building be <br /> prepared by a licensed architect. Transit staff advertised for an architect <br /> to design the structure and to oversee its construction. A purchase order <br /> was awarded to The Haley Architectural Group, Inc. Staff worked with <br /> the architect in designing the plans and in putting the plans out for <br /> construction bids. Four bids were received by the bidding deadline on <br /> November 20th. The attached tabulation of bids shows that the lowest <br /> bidder was Building Systems of Illinois, Inc. <br /> The Mass Transit Administrator and the architect reviewed the bids and <br /> determined that all bids meet all of the specifications stated in the <br /> invitation for bids, with no variances, and that all bids complied with all <br /> requirements of the bidding process. Staff has determined that the <br /> lowest bidder has been responsive to the invitation for bids, and that the <br /> firm is a responsible bidder, as defined by the Federal Transit Adminis- <br /> tration. Building Systems of Illinois, Inc., is not listed on the federal <br /> government's list of vendors that are excluded or debarred from <br /> participating in federally funded contracts. The City has worked with this <br /> firm in the past, and staff is confident that the firm is qualified and capable <br />