My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-166 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR CENTRAL PARK STREETSCAPE & OPEN SPACE ENHANCEMENT PROJECT
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-166 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR CENTRAL PARK STREETSCAPE & OPEN SPACE ENHANCEMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 10:31:36 AM
Creation date
8/20/2015 10:31:10 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-166
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR THE CENTRAL PARK STREETSCAPE & OPEN SPACE ENHANCEMENT PROJECT
Department
Public Works
Approved Date
9/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3.04 SHEET E-1: Keyed note 17 has been edited to additionally read, "Refer <br /> to detail D on drawing E10." <br /> ' 3.05 SHEET E-1: Keyed note 24 has been edited to additionally read, "Refer <br /> to detail D on drawing E 10." <br /> ' 3.06 SHEET E-2: Detail B "nLight Controls Wiring Detail" has been added. <br /> 3.07 SHEET E-5: Changes have been made to the size of the enclosure in <br /> ' detail A. <br /> 3.08 SHEET E-5: Changes have been made to the size of the enclosure in <br /> details C. The lighting control system has also been changed to an nLight <br /> control system. <br /> 3.09 SHEET E-6: Conduits spacing has changed in detail A. <br /> 3.10 SHEET E-6: All of the text is now visible in detail B. <br /> ' 3.11 SHEET E-6: Detail C has been edited to contain more lighting contacts. <br /> ' 3.12 SHEET E-7: Details A and B have been edited to contain an nLight <br /> control system. <br /> ' 3.13 SHEET E-8: Detail C has been edited to contain a base detail, change the <br /> enclosure size and edit the lighting control system. <br /> ' 3.14 SHEET E-8: Detail A has been edited to contain more lighting contacts <br /> 3.15 SHEET E-9: The panel schedule for SPI has had the photocell circuit <br /> ' deleted and a spare breaker added. <br /> 3.16 SHEET E-9: All panel schedules have been noted to share an enclosure <br /> with a second panel. <br /> 3.17 SHEET E-9: Fixture J has been added to the lighting fixture schedule. <br /> ' 3.18 SHEET E-9: The part number for fixture F has been changed in the <br /> lighting fixture schedule. <br /> t3.19 SHEET E-10: Detail B has been edited to reflect the mounting change of <br /> fixture F. <br /> ' 3.20 SHEET L-4: Revised concrete stairs east and west of Transfer House. <br /> 3.21 SHEET L-7: Added detail "Stairs—2 Risers." <br /> 3.22 SHEET L-9: Added detail"Stair Railing—2 Risers." <br />
The URL can be used to link to this page
Your browser does not support the video tag.