Laserfiche WebLink
tCentral Park Streetscape and Open Space Enhancement <br /> Cite Project 2012-14 <br /> August 13, 2012. <br /> ' ADDENDUM N0.3 <br /> ' TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> CENTRAL PARK STREETSCAPE AND OPEN SPACE ENHANCEMENTS <br /> ' CITY PROJECT 2012-1.4 <br /> DATED AUGUST 13,2012 <br /> AD-1-1 NOTICE <br /> 1.01 This Addendum No. 3, dated August 13, 2012,to the Plans, Specifications <br /> and Contract Documents for the above captioned project, supersedes all <br /> ' contrary and conflicting information of the above mentioned bid proposal <br /> documents,which are hereby supplemented in certain particulars as <br /> follows. <br /> ' AD-2-1 BID PROPOSAL <br /> 2.01 The estimated quantities and pay item descriptions as provided on the BID <br /> PROPOSAL have changed as follows: <br /> ' CODE OLD NEW <br /> NUMBER PAY ITEM UNIT TOTAL TOTAL <br /> A0000002 SITE GRADING L SUM 0 1 <br /> ' A0000003 CIVIL WAR MONUMENT FOUNDATION EACH 0 1 <br /> 55080010 STORM SEW CL B 14 FOOT 2-0 30 <br /> ' Z0001110 GAS VALVE ADJUSTED EACH 4 0 <br /> 00000007 12"X12"CATCH BASIN EACH 4Z 18 <br /> 00000050 SEAT WALL FOOT 4-70 143 <br /> ' These changes should be included on the attached BID PROPOSAL. <br /> ' AD-3-1 PROJECT PLANS <br /> t 3.01 SHEET G-2: The summary of quantities sheet should be revised to reflect <br /> changes to the BID PROPOSAL. <br /> 3.02 SHEET C-9: Site grading and storm sewer at the proposed Seat Wall and <br /> ' adjacent sidewalks have been revised. <br /> 3.03 SHEET E-1: Keyed note 14 has been edited to read,"New enclosure to <br /> ' house park light switches. Refer to drawing E-S detail C for more details. <br /> Run (2)#10, (1) #10 GND. in 2" conduit to stand." <br /> ' 3.04 SHEET E-2: Keyed note 2 has been edited to read, "Hand hole/pull box. <br /> Refer to drawing E-4, detail B & C. Hand hole to be located at edge of <br /> 1 <br />