Laserfiche WebLink
VIETNAM MEMORIAL RELOCATION <br /> D('_SCl'ip/IOYI: <br /> This work shall consist of the disassembly and relocation of the existing monument. During the <br /> ' disassembly process the contractor shall observe the manner in which the monument is fastened <br /> to the concrete foundation and monument base. The relocated monument shall be fastened to the <br /> new concrete foundation and monument base in the same manner. The contractor shall give <br /> ' notice to the City of Decatur so that a City Representative can be present during the disassembly. <br /> The Contractor shall construct a new P.C.C. foundation as per detail and location shown on the <br /> project drawings. The Contractor shall re-assemble the monument on the new foundation and <br /> ' orientate the monument as directed by the City. The exposed P.C.C. foundation shall be finished <br /> to a smooth finish. The existing foundation shall be excavated, hauled away and backfilled with <br /> compacted clay. All dowels, fasteners, sealant, fill material, etc. shall be considered incidental to <br /> ' the cost of VIETNAM MEMORIAL RELOCATION. <br /> Pavment: <br /> This work will be paid for at the contract unit price per each for VIETNAM MEMORIAL <br /> ' RELOCATION. <br /> ' SITE GRADING <br /> ' Description: <br /> All site grading shall be in accordance with applicable sections of the IDOT Standard <br /> Specifications. This work shall consist of the all grading, shaping, backfilling and compacting <br /> surfaces as required for the construction of the improvements in Central Park. This work also <br /> includes re-grading for drainage and fill required due to the changes in sidewalk grades,removal <br /> of pavement and other existing structures. The contractor shall provide topsoil free of all stones, <br /> boulders, debris, and similar material larger than 1/2-inch in the largest dimension and finish <br /> ' grade all areas to be seeded. The contractor must compact all subgrade beneath all <br /> improvements to 95% of standard proctor density in accordance with IDOT Standard <br /> Specifications. The contractor will be responsible for supplying all fill material and topsoil <br /> ' required to meet the proposed elevations. The contractor shall remove all excavated material not <br /> needed and not suitable for fill areas. <br /> ' 1'aVmew: <br /> This work will be paid foi-at the contract price of lump sum for SITE GRADING. <br /> ' CIVIL WAR MONUMENT FOUNDATION <br /> ' Deycrlption: <br /> This work shall consist of the construction of a new concrete foundation at the location indicated <br /> on the project drawings. The Contractor shall construct a new P.C.C. foundation as per detail <br /> ' shown as drawing A I as part of Addendum 43. The exposed P.C.C. foundation shall be finished <br /> to a smooth finish. The existing monument foundation shall be excavated, hauled away and <br /> i <br />