My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-162 APPROVING A CHANGE ORDER TO THE AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-162 APPROVING A CHANGE ORDER TO THE AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 10:49:25 AM
Creation date
8/20/2015 10:49:25 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-162
Res Ord Title
APPROVING A CHANGE ORDER TO THE AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP FOR ENGINEERING DESIGN SERVICES FOR THE STREET IMPROVEMENTS TO SOUTH MAIN STREET AND SOUTH FRANKLIN STREET
Approved Date
8/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 14,2012 <br /> Construction Layout Proposal <br /> Project: 2010-13-Main and Franklin Streets Recon&Rehab <br /> Attention:Matt Newell,City Engineer <br /> Client: City of Decatur Phone: (217)424-2747 <br /> #1 Gary K.Anderson Plaza E mail: Matt Newell,City Engineer <br /> Decatur,Illinois 62523 <br /> Scope of Work: HLC to provide City of Decatur with layout services per the following itemized list. <br /> 1 Administration&Management Cost <br /> 1.1 Project Startup-setup files,budget,schedule $ 107.52 <br /> 1.2 Project Management& Close-out $ 254.24 <br /> 1.3 Project Invoicing S 62.58 <br /> 1.4 Check horizontal and vertical datum on site $ 875.84 <br /> 1.5 Client coordination $ 83.72 <br /> Direct Cost S 170.00 <br /> Subtotal $ 1,553.90 <br /> Number of <br /> Field Layout Layout Plan Quantity Units Stakes Cost <br /> 2.1 Centerline Stationing Set lath at 100'intervals offset to sidewalk along Main and Franklin. 24 Hours 74 S 1,520.40 <br /> 2.2 Removal Locate removal items(saw cuts,structures,sidewalk,curb and gutter. <br /> driveway pavement) 45 Hours 199 $ 2,721.60 <br /> 2.3 Drainage Not Included Hours 0 <br /> 2.4 Paving Locate(paving,curb and gutter,sidewalk,driveway pavement,patching) 108 Hours 342 $ 6,325.20 <br /> 2.5 Adjustments Not Included Hours 44 <br /> 2.6 Pavement Marking Locate pavement markings 16 Hours 145 $ 979.16 <br /> Office Work <br /> 2.7 Calculate layout information,check and upload field data 11 Hours 0 $ 840.28 <br /> Any necessary work not included in items 2.1 through 2.5 and any <br /> restaking due to lost stakes will be performed at an hourly crew rate of$ <br /> 109.48 per hour along,a GPS rate of$42.50(if used)and a vehicle <br /> 2.8 Additional Services mileage charge of$0.55 per mile <br /> Direct Cost $ 2,367.00 <br /> Subtotal $14,753.64 <br /> Not to Exceed $16,307.54 <br /> Remarks Proposed drainage structures and structure adjustments were not <br /> included to be staked out.The structures will be placed at the existing <br /> elevations.The station/off-sets are called out on the plans and in the <br /> schedules. <br />
The URL can be used to link to this page
Your browser does not support the video tag.