' Illinois Department
<br /> of Transportation
<br /> Route FRANKLIN&MAIN STREETS(FAP 710)
<br /> ' County MACON
<br /> Local Agency DECATUR
<br /> Section 10-00013-00-FP
<br /> tRETURN WITH BID
<br /> For complete information covering these items,see plans and s ecifications
<br /> Unit
<br /> ' Item No. Items Unit Quantity Price Total
<br /> 60250600 CATCH BASINS TO BE ADJUSTED WITH NEW TYPE 3 FRAME AND GRATE EACH 1 $525.00 $525.00
<br /> 60251500 CATCH BASINS TO BE ADJUSTED WITH NEW TYPE 11 FRAME AND GRATE EACH 11 $525.00 $5,775.00
<br /> 60251700 CATCH BASINS TO BE ADJUSTED WITH NEW TYPE 15 FRAME AND LID EACH 4 $525.00 $2,100.00
<br /> ' 60255800 MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME,CLOSED LID EACH 4 $525.00 $2,100.00
<br /> 60256700 MANHOLES TO BE ADJUSTED WITH NEW TYPE 11 FRAME AND GRATE EACH 1 $525.00 $525.00
<br /> 60256900 MANHOLES TO BE ADJUSTED WITH NEW TYPE 15 FRAME AND GRATE EACH 2 $525.00 $1,050.00
<br /> 60261300 INLETS TO BE ADJUSTED WITH NEW TYPE 11 FRAME AND GRATE EACH 1 $525.00 $525.00
<br /> 60264100 INLETS TO BE RECONSTRUCTED WITH NEW TYPE 15 FRAME AND LID EACH 2 $735.00 $1,470.00
<br /> t 60266600 VALVE BOXES TO BE ADJUSTED EACH 14 $525.00 $7,350.00
<br /> 60500040 REMOVING MANHOLES EACH 4 $1,050.00 $4,200.00
<br /> 60500050 REMOVING CATCH BASINS EACH 2 $262.501 $525.00
<br /> 60500060 REMOVING INLETS EACH 1 $262.50 $262.50
<br /> ' 60600605 CONCRETE CURB,TYPE B FOOT 55 $33.60 $1,848.00
<br /> 60603500 COMBINATION CONCRETE CURB AND GUTTER TYPE B-6.06 FOOT 183 $30.45 $5,572.35
<br /> 60603800 COMBINATION CONCRETE CURB AND GUTTER TYPE B-6.12 FOOT 562 $36.75 $20,653.50
<br /> 60604400 COMBINATION CONCRETE CURB AND GUTTER TYPE B-6.18 FOOT 115 $37.80 $4,347.00
<br /> ' 60605000 COMBINATION CONCRETE CURB AND GUTTER TYPE B-6.24 FOOT 95 $39.90 $3,790.50
<br /> 67100100 MOBILIZATION L SUM 1 $39,923.561 $39,923.56
<br /> 70102630 TRAFFIC CONTROL AND PROTECTION,STANDARD 701601 L SUM 1 $25,622.42 $25,622.42
<br /> 70102635 TRAFFIC CONTROL AND PROTECTION,STANDARD 701701 L SUM 1 $9,271.51 $9,271.51
<br /> 70102640 TRAFFIC CONTROL AND PROTECTION,STANDARD 701801 L SUM 1 1 $6,939.23 $6,939.23
<br /> ' 70103815 TRAFFIC CONTROL SURVEILLANCE CAL DAY 122 $617.63 $75,350.86
<br /> 70300100 SHORT TERM PAVEMENT MARKING FOOT 4,992 $0.89 $4,442.88
<br /> 70301000 WORK ZONE PAVEMENT MARKING REMOVAL SQ FT 832 $4.00 $3,328.00
<br /> 70400100 TEMPORARY CONCRETE BARRIER FOOT 275 $33.57 $9,231.75
<br /> 70400200 RELOCATE TEMPORARY CONCRETE BARRIER FOOT 275 $11.52 $3,168.00
<br /> 72000100 SIGN PANEL TYPE 1 SQ FT 9 $67.05 $603.45
<br /> 78000100 THERMOPLASTIC PAVEMENT MARKING-LETTERS AND SYMBOLS SQ FT 369.2 $8.66 $3,197.27
<br /> 78000200 THERMOPLASTIC PAVEMENT MARKING-LINE 4" FOOT 80 $3.89 $311.20
<br /> ' 78000400 THERMOPLASTIC PAVEMENT MARKING-LINE 6" FOOT 4,209 $1.31 $5,513.79
<br /> 78000600 THERMOPLASTIC PAVEMENT MARKING-LINE 12" FOOT 2,428 $2.52 $6,118.56
<br /> 78000650 THERMOPLASTIC PAVEMENT MARKING-LINE 24" FOOT 213 $6.30 $1,341.90
<br /> 78200530 BARRIER WALL MARKERS,TYPE C EACH 4 $32.71 $130.84
<br /> 78300200 RAISED REFLECTIVE PAVEMENT MARKER REMOVAL EACH 201 $15.86 $3,187.86
<br /> ' X0325279 CLASS SI CONCRETE(MISCELLANEOUS) CU YD 2 $997.50 $1,995.00
<br /> X0327131 DRAINAGE STRUCTURES,NO 1 EACH 1 $10,500.00 $10,500.00
<br /> X4080052 INCIDENTAL HOT-MIX ASPHALT SURFACING(SPECIAL) TON 29 $300.39 $8,711.31
<br /> X4401198 HOT MIX ASPHALT SURFACE REMOVAL,VARIABLE DEPTH SQ YD 515 $43.25 $22,273.75
<br /> X5537800 STORM SEWERS TO BE CLEANED 12" FOOT 115 $18.90 $2,173.50
<br /> X5610012 CAP EXISTING WATER MAIN EACH 1 $1,837.50 $1,837.50
<br /> X6026108 INLETS TO BE RECONSTRUCTED WITH NEW FRAME AND GRATE,SPECIAL EACH 2 $1,470.00 $2,940.00
<br /> X6061700 COMBINATION CONCRETE CURB AND GUTTER,TYPE B(SPECIAL) FOOT 23 $45.15 $1,038.45
<br /> ' X7280105 TELESCOPING STEEL SIGN SUPPORT (SPECIAL) FOOT 16 $30.83 $493.28
<br /> X8140115 HANDHOLE TO BE ADJUSTED EACH 5 $1,403.86 $7,019.30
<br /> Z0018500 DRAINAGE STRUCTURES TO BE CLEANED EACH 4 $420.00 $1,680.00
<br /> Carried forward from page 1 $991,084.78
<br /> ' Bidder's Proposal for making Entire Improvement, $1,312,048.80
<br /> 13. The undersigned further agrees that if awarded the contract for the sections contained in the following combinations,
<br /> he will perform the work in accordance with the requirements of each individual proposal for the multiple bid specified in
<br /> the schedule below.
<br /> ' Schedule for multiple Bids
<br /> Combination letter Sections included in Combination Total
<br /> ' BLR 12222(Rev.04/01/09)
<br /> Printed 8/13/2012 2
<br />
|