Laserfiche WebLink
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> The following Standard Specifications shall govern this project: <br /> The Illinois Department of Transportation(IDOT) "Standard Specifications for Road and <br /> Bridge Construction", adopted January 1, 2012. <br /> The "Manual on Uniform Traffic Control Devices for Streets and Highways" current <br /> version in effect on the date of invitation for bids. <br /> The "Manual of Test Procedures for Materials" current version in effect on the date of <br /> invitation for bids. <br /> The City of Decatur, Department of Public Works, Engineering Division "Construction <br /> Standards", dated January 1, 2003. <br /> The following Special Provisions supplement the Standard Specifications listed above and in <br /> case of conflict with any part, or parts of said specifications, the Special Provisions will take <br /> precedence and shall govern. <br /> SP-1 DESCRIPTION OF WORK <br /> The proposed improvement, designated as City Project 2012-24, consists of resurfacing <br /> various streets in the City of Decatur with micro-surfacing. The work includes restriping the <br /> streets that are resurfaced. <br /> SP-2 TRAFFIC CONTROL <br /> Description: Traffic control shall be in accordance with the applicable sections of the <br /> Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in <br /> the Illinois Manual on Uniform Traffic Devices for Streets and Highways, these Standard <br /> ti Specifications, and any special details and Highway Standards contained herein and in the plans. <br /> ■ Special attention is called to Articles 107.09 and 107.14 and Sections 701, 702, and 703 <br /> of the Standard Specifications for Road and Bridge Construction and the following highway <br /> standards relating to traffic control: <br /> Highway Standards: 701501 701901 <br /> It is the intent of the City that all streets under this project shall be kept open to traffic at <br /> iall times except to permit time to cure unless permission is obtained from the engineer to close <br /> said lane and/or street for other reasons. <br /> In the event that it is necessary to close the lane and/or street, the Engineer shall be <br /> consulted to obtain permission at least 48 working hours in advance of the proposed lane and/or <br /> street closing. All appropriate lane closure permits shall be filed with the Engineering and <br /> Infrastructure Department prior to any street/lane closures. In addition, at the end of every <br /> work day the lane and/or street shall be opened to local traffic unless approved by the Engineer. <br /> It shall be the responsibility of the Contractor to notify the Engineering Division, who will in <br /> turn, notify all forms of local media of the schedule of street closures for the following week <br /> 40 <br />