My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-157 AUTHORIZING SPENDING AUTHORITY OF CITY MANAGER FOR CONTRACTS WITH GREAT LAKES DREDGE & DOCK COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-157 AUTHORIZING SPENDING AUTHORITY OF CITY MANAGER FOR CONTRACTS WITH GREAT LAKES DREDGE & DOCK COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 1:27:53 PM
Creation date
8/20/2015 1:27:48 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-157
Res Ord Title
AUTHORIZING SPENDING AUTHORITY OF CITY MANAGER FOR CONTRACTS WITH GREAT LAKES DREDGE & DOCK COMPANY TO SECURE SUPPLEMENTAL WATER SUPPLY
Approved Date
8/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> All costs incurred to repair pipeline if damaged occurs due to vandalism shall be <br /> considered an extra to the contract price. If failure occurs due to installation no additional <br /> compensation will be paid. <br /> SECTION 36. Standby peration <br /> This work shall be included in the contract unit price per day for Standby Operation, as <br /> marked in Exhibit A. The work shall include the cost to not run the system but to leave the <br /> system in place before authorization for de-mobilization and pipe removal. Price shall <br /> include all work items necessary to prevent freezing of the pumps and pipeline and to <br /> verify the system operational if requested. <br /> SECTION 37. Trenching <br /> This Trenching work shall be competed and paid for in accordance with Section 109.04 of <br /> the Standard Specifications for Road and Bridge Construction, current edition, as marked <br /> in Exhibit A. The work shall include burying and removing the pipeline under driveways, <br /> sidewalks, and Bowshier Ln as described in the Contract Drawings and as directed by the <br /> Engineer. The work shall also include installation of temporary and final pavement <br /> restoration per City standards. <br /> SECTION 38. Alterations Cancellations Extensions Deductions And Extra Work <br /> The funds established in this item shall only be used by the City of Decatur in the event <br /> alterations, cancellations, extensions, deductions, or extra work on the project is required. <br /> All alterations, cancellations, extensions, deductions, or extra work shall be completed and <br /> paid for in accordance with Section 104.02 of the Standard Specifications for Road and <br /> Bridge Construction, current edition, as marked in Exhibit A.. <br /> ATTEST: CITY OF DECATUR, ILLINOIS <br /> By <br /> CITY CLERK CITYMANAG <br /> GREAT LAKES DREDGE AND DOCK CO., LLC <br /> By <br /> SECRETARY (Corporate Seal) VICE PRESIDENT <br /> ELLEN PARKER BURKE SECRETARY STEVEN W. BECKER VICE PRESIDENT <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.