My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:19:32 PM
Creation date
8/20/2015 3:19:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-130
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR ENGINEERING SERVICES TO PREPARE PERMITS AND DESIGN REPAIRS TO THE TAIL WATER DAM
Department
Public Works
Approved Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION II. BASIC SERVICES <br /> A. FINAL DESIGN PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Final Design Phase: <br /> 1. Drawings a�pecifications. Utilizing and using the preliminary design documents and <br /> preliminary design opinion of probable Project costs as approved by the City's Representative, <br /> prepare for incorporation in the Contract Documents final drawings to show the character and <br /> extent of the Project("Drawings")and specifications(Specifications") . The Specification shall <br /> consist of Part 3 "Technical Specifications"of the City's standard Capital Improvement <br /> Construction Contract(CICC). Specific requirements of the aforementioned Drawings and <br /> Specifications are included in Exhibit A, Scope of Services. <br /> 2. Approvals of Governmental Entities. Furnish to the City's Representative such documents and <br /> design data as may be required for, and assist in the preparation of,the required documents so <br /> that the City may apply for approvals of such governmental authorities as have jurisdiction over <br /> design criteria applicable to the Project, and assist in obtaining such approvals by participating in <br /> submissions to and negotiations with appropriate authorities. <br /> 3. Adjusted Project Costs. Advise the City's Representative of any adjustments to the latest opinion <br /> of probable Project Costs caused by changes in extent or design requirements of the Project or <br /> construction costs and furnish a revised opinion of probable Project Cost based on the Drawings <br /> and Specifications. Project Costs include construction cost, contingencies, allowances for charges <br /> of all professionals and consultants, allowances for the cost of land and rights-of-way, allowances <br /> for the relocation of utility facilities and equipment if necessary, and allowances for <br /> compensation for damages to properties and interest and financing charges. <br /> 4. Contract Document Preparation. Complete preparation of the construction contract documents by <br /> filling in the necessary information in Parts I,II, and IV of the City's standard CICC. The <br /> Consulting Engineer shall prepare Part 3 "Technical Specification" of the CICC for inclusion in <br /> the standard construction contract. The Consulting Engineer shall not alter the City's standard <br /> contract document without the permission of the City's Representative. The City's <br /> Representative may provide the Consulting Engineer with previously prepared Technical <br /> Specifications which may be used as appropriate. The Consulting Engineer shall,to the <br /> maximum extent possible, follow the formats for Technical Specifications as provided by the <br /> City'sP Representative. <br /> 5. Document Presentation. Furnish paper copies and digital copies of the CICC in the number and <br /> format specified in Exhibit A, Scope of Work and present and review the CICC in person with the <br /> City as the City's Representative shall direct. The cost of document reproduction shall be <br /> considered to be a reimbursable expense and paid in accordance with Section V(C) of this <br /> Agreement. <br /> 6. Completion Time. The Final Drawings and Specifications shall be completed, submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C, Project <br /> Timeline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.