My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-123 AUTHORIZING EXECUTION OF AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-123 AUTHORIZING EXECUTION OF AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:32:30 PM
Creation date
8/20/2015 3:32:29 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-123
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENT - MACON COUNTY WWII MEMORIAL COMMITTEE
Approved Date
6/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> documents the Authority shall irmnediately be furnished with an accurate copy thereofAny changes in <br /> the plans or specification or the manner or type of Memorial shall be subject to the prior written <br /> approval of the Authority. <br /> 3. Temporary Easement; Drains. <br /> (A) Movement of Traffic. The Committee acknowledges,understands and agrees <br /> that the area surrounding the circle is located in'a public street which is frequently used by motor <br /> vehicles and will continue to be so used during any period of construction of the Memorial area. <br /> The Committee nor its agents or contractors will use their best efforts not to cause any obstruction to <br /> motor vehicle or pedestrian traffic during the construction or use of the Memorial area. The <br /> authority grants pern fission for parking a construction trailer west of the site. <br /> (B) Temporary Easement. The Authority does hereby grant to the Committee, <br /> its agents and contractors, during the construction only of the Memorial area, a temporary easement <br /> equal to an additional ten (10) feet or otherwise mutually agreed upon distance beyond the <br /> circumference of the circle hereinabove described for the purpose of and during the time of <br /> construction of said Memorial area. At the completion of the construction, the temporary easement <br /> shall cease. <br /> (C) Drains; Debris. Any subsurface drain pipes found in the construction of the <br /> Memorial area will not be disturbed, or, if necessary to disturb, shall be replaced at the cost of the <br /> Committee. The Authority shall be notified of any drain found or disturbed, and the Authority shall <br /> previously approve any replacement or disturbance. All debris caused by such construction shall be <br /> removed and legally disposed of by the Committee, or its.agents or contractors, off the premises of <br /> the Authority. <br /> 4. Cost. <br /> (A) Cost of Project. All costs associated with the implementation of this <br /> Agreement("project")by the Cominittee shall be at the cost of the Committee. Such costs include, but <br /> are not limited to, architectural and engineering fees, construction costs, materials and supplies, <br /> removal of-debris. In no event shall the Authority be liable for or become liable for any cost in <br /> relation to the project. The Committee and its agents and contractors shall take particular care in <br /> performing work on the project which would insure that no damage occurs to any Authority property. <br /> (B) Liens. The Committee agrees that all improvements., alterations, construction <br /> and changes made by the Committee on the property of the Authority, including the circle and <br /> Memorial area, shall be timely paid for in full and that no Mechanic's Lien or any other lien will be . <br /> filed against any property or funds of the Authority by reason of the tennis of this Agreement. <br /> 5. Maintenance and Repair. <br /> (A)The Committee and the City of Decatur, an Illinois municipal corporation, <br /> Page -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.