E. EXTRA WORK AND CHANGE ORDERS. The Consulting Engineer shall only perform only <br /> the work authorized by this contract and defined in the Scope of Work(attached hereto,marked <br /> Exhibit A, incorporated by reference herein and made a part of this Agreement). Should the size or <br /> complexity of the project exceed the amount of work contemplated by this contract or defined in the <br /> Scope of Work,the Consulting Engineer shall obtain written authorization in the form of a Change <br /> Order from the City's Representative,to perform extra work before such work is actually performed. <br /> A Change Order form is included in this Agreement as Exhibit D. The cost to perform any work prior <br /> to written authorization shall be paid exclusively by the Consulting Engineer and shall not be <br /> reimbursed by the City. <br /> The Consulting Engineer expressly acknowledges, recognizes and agrees that the only authority to <br /> approve change orders to this Agreement or the Scope or Services or the cost(s)therein is with the <br /> City Council of the City. <br /> SECTION H. BASIC SERVICES <br /> A. FINAL DESIGN PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Final Design Phase: <br /> 1. Drawings and Specifications. Utilizing and using the preliminary design documents and <br /> preliminary design opinion of probable Project costs as approved by the City's Representative, <br /> prepare for incorporation in the Contract Documents final drawings to show the character and <br /> extent of the Project("Drawings")and specifications (Specifications") . The Specification shall <br /> consist of Part 3"Technical Specifications" of the City's standard Capital Improvement <br /> Construction Contract(CICC). Specific requirements of the aforementioned Drawings and <br /> Specifications are included in Exhibit A, Scope of Services. <br /> 2. Approvals of Governmental Entities. Furnish to the City's Representative such documents and <br /> design data as may be required for,and assist in the preparation of, the required documents so <br /> that the City may apply for approvals of such governmental authorities as have jurisdiction over <br /> design criteria applicable to the Project, and assist in obtaining such approvals by participating in <br /> submissions to and negotiations with appropriate authorities. <br /> 3. Adjusted Project Costs. Advise the City's Representative of any adjustments to the latest opinion <br /> of probable Project Costs caused by changes in extent or design requirements of the Project or <br /> construction costs and furnish a revised opinion of probable Project Cost based on the Drawings <br /> and Specifications.Project Costs include construction cost, contingencies, allowances for charges <br /> of all professionals and consultants, allowances for the cost of land and rights-of-way, allowances <br /> for the relocation of utility facilities and equipment if necessary,and allowances for <br /> compensation for damages to properties and interest and financing charges. <br /> 4. Contract Document Preparation. Complete preparation of the construction contract documents by <br /> filling in the necessary information in Parts I, II, and IV of the City's standard CICC. The <br /> Consulting Engineer shall prepare Part 3 "Technical Specification"of the CICC for inclusion in <br /> the standard construction contract. The Consulting Engineer shall not alter the City's standard <br /> contract document without the permission of the City's Representative. The City's <br /> Representative may provide the Consulting Engineer with previously prepared Technical <br /> Specifications which may be used as appropriate. The Consulting Engineer shall,to the <br /> maximum extent possible, follow the formats for Technical Specifications as provided by the <br /> City's Representative. <br />