Laserfiche WebLink
5. Document Presentation. Furnish paper copies and digital copies of the report in the number and <br /> format specified in Exhibit A, Scope of Work and present and review the report in person with <br /> the City as the City's Representative shall direct. The cost of document reproduction shall be <br /> considered to be a reimbursable expense and paid in accordance with Section V(C)of this <br /> Agreement. <br /> 6. Completion Time. The Final Drawings and Specifications shall be completed, submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C,Project <br /> Timeline. <br /> B. BIDDING PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Bidding Phase: <br /> 1. Assist in Bidding. Assist the City's Representative in obtaining bids for each separate City <br /> contract for construction, materials, equipment and services for the Project. <br /> 2. Advise Re ag rding:Contractors and Subcontractors. Consult with and advise the City's <br /> Representative as to the acceptability of subcontractors and other persons and organizations <br /> proposed by the City's Contractors,("Contractors"), for those portions of the work as to which <br /> such acceptability is required by the bidding documents. <br /> 3. Consult Regarding Substitutes. Consult with and advise the City's Representative as to the <br /> acceptability of substitute materials and equipment proposed by the Contractors when substitution <br /> prior to the award of contracts is allowed by the bidding documents. <br /> 4. Provide Plans and Contract Documents to the City. Reproduce sufficient copies of the plans and <br /> contract documents and make them available to the City for distribution to all prospective <br /> bidders. The City shall create a Plan Holder List by recording the business name, contact person <br /> name, address,telephone number, fax number and email address of each of the bidders taking a <br /> set of plans and contract documents. Alternately,the Consulting Engineer may arrange to have <br /> plans and specifications made available to prospective bidders through the services of a plan and <br /> specification duplication firm that offers plan distribution services provided that the firm obtains <br /> the same bidder information required by the City and that no cost for this service be billed to the <br /> City. <br /> 5. Respond to Questions from Bidders. Receive and respond to questions from prospective bidders <br /> during the bidding period. All responses shall be written and shall be provided to all plan holders <br /> as listed on the Plan Holder List. Questions received five(5)business days before the bid <br /> opening shall be answered. Questions received between four(4)and two(2)business days before <br /> the bid opening may be answered provided that a means exists to communicate the answer in <br /> writing to all the bidders. Questions received one(1)business day before or on the day of the bid <br /> opening shall not be answered. Answers to questions should be distributed to bidders by email, <br /> however if a bidder does not have email service the documents may be transmitted by fax. <br /> 6. Tabulate and Evaluate Bids, Recommend Award. Prepare and provide to the City's <br /> Representative a bid tabulation which shall consist of a listing of all pay items in the contract <br /> documents, a listing of the Consulting Engineer's Opinion of Probable Costs, and a listing of the <br /> bids for each of the pay items submitted by each of the bidders. The Consulting Engineer shall <br /> tabulate the bids on an electronic spreadsheet form provided by the City's Representative. The <br /> Consulting Engineer shall assist the City's Representative in evaluating bids or proposals and in <br /> assembling and awarding contracts. The Consulting Engineer shall check the bidder's references <br />