My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-100 APPROVING AMENDMENT TO THE AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-100 APPROVING AMENDMENT TO THE AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:42:32 AM
Creation date
8/21/2015 9:42:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-100
Res Ord Title
APPROVING AMENDMENT TO THE AGREEMENT WITH URS CORPORATION FOR CONSTRUCTION ENGINEERING SERVICES FOR REPLACEMENT OF SOUTH SHORES BRIDGE OVER THE SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
5/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the rest of the bridge. In August 2006,the Illinois Department of Transportation(IDOT) directed the <br /> City to place a weight restriction on the bridge and to perform follow-up inspections every 6 months to <br /> monitor the outside beams of the bridge. Since the damaged beams are not in the wheel path, the bridge <br /> is safe for normal traffic; however, the 6 month inspections show that the bridge's deterioration is <br /> increasing. The bridge needs to be replaced before stricter traffic restrictions or full closure is required. <br /> Public input gathered as part of the design process indicated a desire to raise clearance height of the <br /> replacement bridge. The City Council supported the proposal to raise the bridge by 3 feet. <br /> $1,325,000 in Federal Surface Transportation Program—Urban (STU) funding is being requested to <br /> fund a portion of the bridge replacement cost. Current estimates show the bridge and roadway <br /> replacement cost at$2, 650,000 and the cost to raise and relocate the Sanitary District interceptor at <br /> $500,000. Federal funds are planned to pay 50%of the bridge replacement cost, with the balance being <br /> paid from the City's allotment of Motor Fuel Tax funds which are levied, collected and distributed by <br /> the State. <br /> Required Project Authorizations <br /> 1. The Local Agency Agreement with the State of Illinois authorizes the Illinois Department of <br /> Transportation to advertise for bids and award a contract to the lowest responsible bidder for the <br /> construction of the South Shores Bridge. The Agreement sets the funding to pay for the project <br /> based on the engineer's estimate of probable construction cost. The current division of cost is <br /> $1,325,000 in Federal funds and $1,825,000 in City funds including$500,000 to relocate the <br /> SDD interceptor. The interceptor costs will be reimbursed by the District. The$1,325,000 in <br /> Federal funds are pending approval by the Decatur Urban Transportation Study(DUATS) at a <br /> meeting scheduled for May 8. <br /> 2. This item appropriates $1,325,000 in Motor Fuel Tax(MFT) funds to pay the City's estimated <br /> portion of the South Shores Bridge project. The Sanitary District will reimburse the MFT fund <br /> for interceptor relocation costs currently estimated at $500,000. <br /> 3. This is the approval of an Intergovernmental Cooperation Agreement with the Sanitary District <br /> of Decatur to reimburse the City for project expenses related to the relocation of a District <br /> interceptor attached to the bridge. Under the agreement,the District will reimburse the City for <br /> the actual relocation cost which is currently estimated at $500,000. The Agreement is for <br /> $560,000 or actual costs and was passed by the District Board on March 2lt. <br /> 4. The amendment to the design services agreement between the City of Decatur and URS <br /> Corporation will retain the services of URS during the bridge construction and sewer relocation <br /> work. The City requires the services of URS to approve materials and detail drawings proposed <br /> by the contractor. In addition, questions or construction issues arise during the project that may <br /> require the assistance of URS to address. The construction engineering services for the South <br /> Shores Bridge project are for an additional fee of$30,000 which is added to the current <br /> authorized fee of$246,200, for a total not to exceed fee of$276,200. This fee is allocated in the <br /> MFT fund. <br /> Project Schedule <br /> Currently, the project is scheduled for a bid opening by IDOT on June 15, 2012. The South Shores <br /> Drive Bridge replacement work should begin in August with completion summer of 2013. One reason <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.