Laserfiche WebLink
Exhibit A <br /> URS Corporation <br /> Prepared By: KW B Date: 4/5/2012 <br /> Checked By: Date: <br /> City of Decatur-Replacement of South Shore Drive Bridge over Sand Creek Arm of Lake Decatur(SN 058-6003) <br /> Tasks, Manhour and Fee Estimate-Phase III Engineering Assistance <br /> Classification <br /> Task Activity Project Eng 1 Eng 2 Structural Tech Surveyor Rodman Manhour Factored <br /> Manager Engineer Totals Labor <br /> 20100 Project Management <br /> Prepare Project Initiation Forms 2.0 2.0 $338.90 <br /> Prepare PXP 2.0 2.0 $338.90 <br /> Project Administration/Invoicing 18.0 18.0 $3,050.14 <br /> Total this Task 22.0 0.0 0.0 0.0 0.0 0.0 0.0 22.0 $3,727.94 <br /> Construction Phase-URS <br /> 20205 Attend Pre-Construction Conference 2.0 2.0 $338.90 <br /> 20210 Respond to Request's for Information(RFIs) 12.0 5.0 17.0 $1,886.65 <br /> 20215 Check/Distribute Shop Drawings 24.0 3.0 27.0 $2,587.14 <br /> 20220 Respond to Construction Questions 3.0 14.0 3.0 17.0 37.0 $3,705.48 <br /> 20225 Construction Survey-Checks 32.0 32.0 64.0 $5,049.22 <br /> Total this Task 5.0 50.0 0.0 11.0 17.0 32.0 32.0 147.0 $13,567.39 <br /> Construction Phase-URS-SDD Sewer <br /> 20310 Res'pond to Request's for Information RFIs 6.0 3.0 9.0 $1,028.05 <br /> 20315 Check/Distribute Shop Drawings 16.0 1.0 17.0 $1,555.31 <br /> 20320 Respond to Construction Questions 3.0 6.0 3.0 6.0 18.0 $2,057.40 <br /> 20325 Construction Survey-Checks 8.0 8.0 16.0 $1,262.30 <br /> Total this Task 3.0 28.0 0.0 7.0 6.0 8.0 8.0 60.0 $5,903.06 <br /> Manhour Total 30.0 78.0 0.0 18.0 23.0 40.0 40.0 229.0 <br /> Raw Rates $62.76 $32.08 $28.60 $62.76 $32.16 $32.36 $26.08 <br /> Multiplier 2.70 2.70 2.70 2.70 2.70 2.70 2.70 <br /> Subtotal-Loaded Labor, $5,083.56 $6,756.05 $0.00 $3,050.14 $1,997.14 $3,494.88 $2,816.64 $23,198.40 $23,198.40 <br /> Task Activity Principal AEX Factored <br /> Labor <br /> 30200 Construction Phase-BGM-City San.Sewer <br /> Attend Pre-Construction Conference 2.0 $310.59 <br /> Review Shop Drawings 18.0 $2,795.31 <br /> AEX Electrical Review $535.50 $535.50 <br /> Construction Observation 3.0 $465.89 <br /> Respond to Construction Questions 6.0 $931.77 <br /> Total this Task 29.0 $535.50 $5,039.06 <br /> 30300 Construction Phase-BGM-SDD Sewer <br /> Review Shop Drawings 2.0 $310.59 <br /> Construction Observation 2.0 $310.59 <br /> Respond to Construction Questions 6.0 $931.77 <br /> Total this Task 10.0 $1,552.95 <br /> Total 39.0 $535.50 $6,592.01 <br /> Raw Rates $50.00 <br /> Multiplier 3.045 <br /> Prime Multiplier on Sub 1.02 <br /> Subtotal-Loaded Labor, $6,056.51 $535.50 $6,592.01 <br /> A-4 <br />