My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-100 APPROVING AMENDMENT TO THE AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-100 APPROVING AMENDMENT TO THE AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:42:32 AM
Creation date
8/21/2015 9:42:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-100
Res Ord Title
APPROVING AMENDMENT TO THE AGREEMENT WITH URS CORPORATION FOR CONSTRUCTION ENGINEERING SERVICES FOR REPLACEMENT OF SOUTH SHORES BRIDGE OVER THE SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
5/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> URS Corporation <br /> Prepared By: KW B Date: 4/5/2012 <br /> Checked By: Date: <br /> City of Decatur-Replacement of South Shore Drive Bridge over Sand Creek Arm of Lake Decatur(SN 058-6003) <br /> Tasks, Manhour and Fee Estimate-Phase III Engineering Assistance <br /> Classification <br /> Task Activity Project Eng 1 Eng 2 Structural Tech Surveyor Rodman Manhour Factored <br /> Manager Engineer Totals Labor <br /> 20100 Project Management <br /> Prepare Project Initiation Forms 2.0 2.0 $338.90 <br /> Prepare PXP 2.0 2.0 $338.90 <br /> Project Administration/Invoicing 18.0 18.0 $3,050.14 <br /> Total this Task 22.0 0.0 0.0 0.0 0.0 0.0 0.0 22.0 $3,727.94 <br /> Construction Phase-URS <br /> 20205 Attend Pre-Construction Conference 2.0 2.0 $338.90 <br /> 20210 Respond to Request's for Information(RFIs) 12.0 5.0 17.0 $1,886.65 <br /> 20215 Check/Distribute Shop Drawings 24.0 3.0 27.0 $2,587.14 <br /> 20220 Respond to Construction Questions 3.0 14.0 3.0 17.0 37.0 $3,705.48 <br /> 20225 Construction Survey-Checks 32.0 32.0 64.0 $5,049.22 <br /> Total this Task 5.0 50.0 0.0 11.0 17.0 32.0 32.0 147.0 $13,567.39 <br /> Construction Phase-URS-SDD Sewer <br /> 20310 Res'pond to Request's for Information RFIs 6.0 3.0 9.0 $1,028.05 <br /> 20315 Check/Distribute Shop Drawings 16.0 1.0 17.0 $1,555.31 <br /> 20320 Respond to Construction Questions 3.0 6.0 3.0 6.0 18.0 $2,057.40 <br /> 20325 Construction Survey-Checks 8.0 8.0 16.0 $1,262.30 <br /> Total this Task 3.0 28.0 0.0 7.0 6.0 8.0 8.0 60.0 $5,903.06 <br /> Manhour Total 30.0 78.0 0.0 18.0 23.0 40.0 40.0 229.0 <br /> Raw Rates $62.76 $32.08 $28.60 $62.76 $32.16 $32.36 $26.08 <br /> Multiplier 2.70 2.70 2.70 2.70 2.70 2.70 2.70 <br /> Subtotal-Loaded Labor, $5,083.56 $6,756.05 $0.00 $3,050.14 $1,997.14 $3,494.88 $2,816.64 $23,198.40 $23,198.40 <br /> Task Activity Principal AEX Factored <br /> Labor <br /> 30200 Construction Phase-BGM-City San.Sewer <br /> Attend Pre-Construction Conference 2.0 $310.59 <br /> Review Shop Drawings 18.0 $2,795.31 <br /> AEX Electrical Review $535.50 $535.50 <br /> Construction Observation 3.0 $465.89 <br /> Respond to Construction Questions 6.0 $931.77 <br /> Total this Task 29.0 $535.50 $5,039.06 <br /> 30300 Construction Phase-BGM-SDD Sewer <br /> Review Shop Drawings 2.0 $310.59 <br /> Construction Observation 2.0 $310.59 <br /> Respond to Construction Questions 6.0 $931.77 <br /> Total this Task 10.0 $1,552.95 <br /> Total 39.0 $535.50 $6,592.01 <br /> Raw Rates $50.00 <br /> Multiplier 3.045 <br /> Prime Multiplier on Sub 1.02 <br /> Subtotal-Loaded Labor, $6,056.51 $535.50 $6,592.01 <br /> A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.