Laserfiche WebLink
Exhibit A <br /> Construction Phase-Subconsultants Bainbridge,Gee,Milanski&Assoc <br /> Direct <br /> Principal Cost <br /> Attend Pre-Construction Conference 2 <br /> City Sanitary Sewer <br /> Review Shop Drawings <br /> Sewer Materials 2 <br /> Pump Station Equipment 4 <br /> Pump Station Power 4 <br /> Pump Station Controls 8 <br /> AEX Electrical Review $500.00 <br /> Construction Observation 3 <br /> Respond to Construction Questions 6 <br /> SDD Sanitary Sewer <br /> Review Shop Drawings <br /> Sewer Materials 2 <br /> Construction Observation 2 <br /> Respond to Construction Questions 6 <br /> Total 39 $500.00 <br /> Direct Salary Rate per Hour $50.00 <br /> Direct Labor Costs $1,950.00 <br /> Multiplier 3.045 1.05 <br /> Total Estimated Cost-Construction Phase $5,937.75 $525.00 <br /> TOTAL $6,462.75 <br /> A-6 <br />