My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-56 AUTHORIZING AN AGREEEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-56 AUTHORIZING AN AGREEEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 2:01:54 PM
Creation date
8/21/2015 2:01:09 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-56
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP FOR THE PHASE II FINAL DESIGN OF THE FRANKLIN STREET PORTION OF THE DOWNTOWN STREETSCAPE AND OPEN SPACE ENHANCEMENT PROGRAM
Approved Date
3/19/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECTURAL EXPRESSIONS,LLP 5/31/2011 <br /> Franklin Street Design Fee Allocation <br /> For IDOT Review Final Design and Drawings <br /> Meetings/Coorespondence Design Drafting Meetings/Correspondence Design Drafting <br /> Design Task Engineer Technician Engineer ITechnician Engineer ITechnician Engineer Technician Engineer ITechnician Engineer ITechnician <br /> Preliminary Meetings 6 <br /> Preliminary Coordination 6 <br /> Field Work 16 4 <br /> Review Existing Plans 16 <br /> Set Up Drawings and Base Plans 20 <br /> Determine Receptacle and power outlet <br /> requirements 6 30 20 4 2 <br /> Locate receptacles and power outlets 8 6 8 4 <br /> Determine Lighting level requirments 6 40 <br /> Light fixture and pole selection and <br /> specifications 2 24 <br /> Sepcify Light fixture locations 4 28 12 16 8 <br /> Photometric Calculations 2 32 8 2 <br /> Utility Coordination-Ameren 4 8 2 2 1 <br /> Utility Coordination-Others 2 4 8 8 8 <br /> Electric Load Calculations 16 8 <br /> Determine Electric Service Locations 2 4 2 4 2 <br /> Determine Electric Service Sizes 6 2 4 2 <br /> Detail Service Panels&Pedistals 16 8 16 8 <br /> Circuit Lights 16 12 4 2 <br /> Circuit Receptacles 16 12 4 2 <br /> Complete Electric Panel Schedules 4 8 4 4 <br /> Voltage Drop Calculations 4 8 <br /> Calculate wire Sizes&Quantities 30 12 8 4 <br /> Determine Conduit sizes and Quantities 16 8 2 2 <br /> Locate Pull Boxes 4 2 <br /> Drawing Details 8 16 8 16 <br /> Determination of Pay Items 8 2 1 <br /> Probable Construction Cost 8 8 <br /> IDOT Submission/Revisions/Resubmittal 4 4 4 <br /> Specifications 40 <br /> Final Drawing Review&Revisions 4 16 8 <br /> Addendums and Clarifications 2 8 2 <br /> Final Schedule of Values I I 1 1 8 1 8 <br /> Total Hours: 44 0 362 0 0 142 16 0 206 0 0 88 <br /> Hourly Rate: $125 $60 $125 $60 $125 $60 $125 $60 $125 $60 $125 $60 <br /> Subtotals $5,500 $0 $45,250 $0 $o $8,S201 $2,000 $o $25,750 $0 $0 $5,280 <br /> Total for IDOT Review $59,270 <br /> Total for Final Drawings and Specifications $33,030 <br /> Grand Total: $92,300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.